24
Figure 27 – Cable Configurations: C1 –
C4
13.
Connect the sensor branch cable (
C02
)
to the 4-pin AMP plug on
C02B
.
14.
Route the sensor branch cable (
C02
) to
the wing and main sensors. Follow
existing cables and/or hydraulic lines
along the boom.
15.
Cable-tie the installed cables every 12
inches.
IMPORTANT:
Provide enough slack in all cables to
account for the movement of the main
section, parallel lift, and FOLDING boom
movement.