12
4.
COMMISSIONING, TRANSPORTING, DECOMMISSIONING
a.
Commissioning
Table 2: Commissioning data
Type
PS12CB-C
PS15CB-C
Commissioning weight [kg]
1842
2162
Dimensions [mm]
3600
4500
After receiving our new pallet stacker or for re-commissioning you have to do following
before (firstly) operating the truck:
•
Check if are all parts included and not damaged
•
Check the package and charging of the battery (follow chapter 7)
•
Do the work according to the daily inspections as well as functional checks.
b.
Lifting/ transportation
Lifting
Use dedicated crane and lifting equipment.
Do not stand under the swaying load.
Do not walk into hazardous area during lifting.
Transportation
ALWAYS FASTEN TRUCK SECURELY DURING
TRANSPORTATION ON A LORRY OR TRUCK.
Lower the forks and park the truck securely.
Fasten the truck according to Fig. 6 by fixing dedicated
lashing belts to chassis, fork carriage and mast, and fasten
the other side at the transporting truck.
Fig. 5: Lift with a crane
Fig. 6: Fixing points
For transporting, remove the load, lower the forks to the lowest
position and fix the truck safely with dedicated crane or lifting
equipment according to Fig. 5.
Park the truck securely and lash the truck according to the points
identified in Fig. 6. Lift the truck to its destination and place the
truck securely before removing the lifting equipment. The fixing
points are according to the Fig. 6.
Содержание PS12/15CB-C
Страница 4: ...4 c Technical data for US market 30 12 DECLARATION OF CONFORMITY valid if sold within the EU 32...
Страница 7: ...7 b Main technical data Fig 2 Technical data...
Страница 25: ...25 b Hydraulic circuit diagram Fig 16 Hydraulic circuit diagram without tilting...
Страница 26: ...26 Fig 17 Hydraulic circuit diagram with tilting...