37
FIG.23
Remove the battery park
5.
Hold the middle of the new battery pack and insert it. Once install the new battery pack, make
sure it is completely inserted into the chassis as fig 24 shows.
FIG.24
Installation for battery pack
Testing New Batteries
To test new batteries:
1. Plug the UPS into a power outlet for 48 hours to charge the batteries.
2. Start up the UPS by pressing the start up combination button.
3. Press the battery test combination button to activate the battery test.
The UPS starts a battery test if the batteries are fully charged, the UPS is in Normal mode with no
active alarms, and the bypass voltage is acceptable.
During the battery test, the UPS transfers to Battery mode and discharges the batteries for 10
seconds. The LED indicators of the front cover stop cycling when the test is completed.
Recycling the Used Battery or UPS
Contact your local recycling or hazardous waste center for information on proper
disposal of the used battery or UPS.