CAUTION
● The following process must be performed if the UPS is connected with generator.
● First, turn on the generator, after it runs stably connect output power of the
generator to UPS input terminal, then turn on the UPS. After the UPS is turned on,
please connect load one by one.
● It is recommended that the generator capacity is as twice as the UPS rated capacity.
● You had better not use the ECO mode when the quality of the input AC mains is not
good.