14
To replace the cover, verify that the EBP cables are routed through the EBP cover knockouts, cover
connects with the cover hook near the left side of the EBP cabinet. Repeat for each additional EBP.
It is the same with the installation of the front cover. (Refer” to UPS installation”)
8.
Verify that all wires connected between the UPS and EBP(s) are installed behind the front covers
and not accessible to users.
9.
Return to Step 4 to continue the UPS installation.