1.4.2.  Use 

D700 voltage regulators are components designed for integration in installations or electrical machines. 
When integrated in a machine, commissioning must not take place until it has been verified that the machine 
conforms  with  directive  2006/42/EC  (Machinery  Directive).  It  is  also  necessary  to  comply  with  standard 
EN 60204, which stipulates in particular that electrical actuators (which include AVRs) cannot be regarded as 
circuit-breaking devices and certainly not as isolating switches. 
Commissioning  can  take  place  only  if  the  requirements  of  the  Electromagnetic  Compatibility  Directive 
(EMC 2014/30/EU) are met. 
Voltage  regulators  meet  the  requirements  of  the  Low  Voltage  Directive  2014/35/EU.  The  harmonised 
standards  of  the  DIN  VDE  0160  series  in  connection  with  standard  VDE  0660,  part  500  and  EN  60146/ 
VDE 0558 are also applicable. 
The  technical  characteristics  and  instructions  concerning  the  connection  conditions  specified  on  the 
nameplate and in the documentation provided must be observed without fail. 

1.4.3.  Transportation, storage 

All instructions concerning transportation, storage and correct handling must be observed. 
The climatic conditions specified in this manual must be observed. 

1.4.4.  Installation 

The installation and cooling of equipment must comply with the specifications in the documentation supplied 
with the product. 
The dual plate D700 must be protected against excessive stress. In particular, there must be no damage to 
parts  and/or  modification  of  the  clearance  between  components  during  transportation  and  handling.  Avoid 
touching the electronic components and contact parts. 
The dual plate D700 contains parts which are sensitive to electrostatic stress and may be easily damaged if 
handled incorrectly. Electrical components must not be exposed to mechanical damage or destruction (risks 
to health and/or of electrocution on power-up). 

1.4.5.  Electrical connection 

When  work  is  performed  on  the  dual  plate  D700  while  powered  up,  the  national  accident  prevention 
regulations must be observed. 
 
The electrical installation must comply with the relevant specifications (for example conductor cross-sections, 
protection via fused circuit-breaker, connection of protective conductor). More detailed information is given in 
this manual. 
 
Instructions  for  an  installation  which  meets  the  requirements  for  electromagnetic  compatibility,  such  as 
screening, earthing, presence of filters and correct insertion of cables and conductors, are also given in this 
manual. These instructions must be followed in all cases, even if the AVR carries the CE mark. Adherence to 
the limits given in the EMC legislation is the responsibility of the manufacturer of the installation or the machine. 
 
For an installation in Europe: the current sensors must guarantee initial basic insulation in conformity with the 
requirements  of  standard  IEC  61869-1,  Instrument  transformers  –  "Part  1:  General  requirements"  and 
IEC 61869-2, "Part 2: Additional requirements for current transformers". 
For an installation in the USA: the current sensors must guarantee initial basic insulation in conformity with 
the  requirements  of  standards  IEEE  C57.13,  "Requirements  for  Instrument  Transformers"  and  IEEE 
C57.13.2, "Conformance Test Procedure for Instrument Transformers". 
 

 

 

Содержание Leroy-Somer D700

Страница 1: ...Dual plate Installation and maintenance D700...

Страница 2: ......

Страница 3: ...of the cabinet housing the dual plate 10 2 2 Connection block 10 2 3 Consumption 13 2 4 Wiring precautions 13 3 Setup instructions 14 3 1 Stator voltage and current measurement 14 3 2 Configuration fi...

Страница 4: ...s for 10 seconds maximum 1 This plate has been designed to be installed in a control and power switching cabinet These cabinets must provide the minimum conditions for protection and safety of electri...

Страница 5: ...of the generator field circuit Two freewheel diode modules connected on the field circuit to ensure it never opens All the controls 9 configurable inputs hard wired to deliver the same information to...

Страница 6: ...ge 50 400 VDC 110 max 2 minutes Consumption 3000 VA Field current Rated 0 25 A Short circuit max 50 A at 25 C Field winding resistance 4 Ohm Frequency measurement Range 30 400 Hz For the plate 3 auxil...

Страница 7: ...Electric Power Generation Installation and maintenance 5747 en 2018 10 a Dual plate D700 7 Fixings 371 32 28 8 352 06 CG CG 750 750 119 5 725 725...

Страница 8: ...ally the prevention of direct or indirect contact when the plate is powered up LEROY SOMER declines all responsibility in the event of the above recommendations not being observed The various interven...

Страница 9: ...cation of the clearance between components during transportation and handling Avoid touching the electronic components and contact parts The dual plate D700 contains parts which are sensitive to elect...

Страница 10: ...you with any additional information you may require This manual is to be given to the end user 1 4 8 Protection of the equipment Auxiliary power supplies for the AVRs and the control circuit which ar...

Страница 11: ...1 XM 13 Phase NW2 L2 XM 15 Phase NW3 L3 XM 12 Phase NW1 L1 Mains voltage measurement AVR 2 XM 14 Phase NW2 L2 XM 16 Phase NW3 L3 XP 1 Power X1 Field power AVR 1 XP 3 Power X2 XP 5 Power Z1 XP 7 Power...

Страница 12: ...nd AVR 1 and 2 XC 16 Plate 24VDC XC 17 DI6 input command AVR 1 and 2 XC 18 Plate 24VDC XC 19 DI7 input command AVR 1 and 2 XC 20 Plate 24VDC XC 21 DI8 input command AVR 1 and 2 XC 22 Plate 24VDC XC 23...

Страница 13: ...cable length must never exceed 100 m To ensure compliance with standards IEC 61000 6 2 IEC 61000 6 4 and IEC 60255 26 shielded cables are essential in the case of a D700 installed outside the termina...

Страница 14: ...nd to the technical and electrical data of the generator on which the plate is to be installed It is therefore important to pay particular attention to the following settings Generator power rated vol...

Страница 15: ...is checked In both cases the drawing on the right is updated with the appearance of a second D700 On the Protections page the following faults are automatically activated Machine fault tab reactive p...

Страница 16: ...activated if the AVR is active DO2 and DO10 are activated if the AVR is online 3 3 Checks prior to commissioning First it is necessary to check the wiring and general operation of the plate Step 1 Ins...

Страница 17: ...t breakers are closed properly in the generator Check that the status of both AVRs is OFF 3 4 Aligning measurements Once these checks have been done make sure that the measurements on both AVRs give s...

Страница 18: ...ry or secondary values of the main stator current transformers and or isolating transformers General machine configuration Step 5 Setting the PF With the same load check the PF measurement on the wait...

Страница 19: ...the serial link The regulation context is then preserved in the event of switching and running in manual mode 4 3 4 Switching on a fault Several faults can cause switching from the active AVR to the o...

Страница 20: ...a circuit which monitors the power transistors If there is a discrepancy between the transistor command and its action the active AVR switches to fault mode and the online AVR switches to active mode...

Страница 21: ...ching does not occur that may then come from the sensing VT Note By default no action has been programmed for loss of sensing A significant bump may therefore occur on switching to the online AVR This...

Страница 22: ...that may then come from a fault in the link to the exciter Note By default no action has been programmed for reactive reverse power A significant bump may therefore occur on switching to the online AV...

Страница 23: ...is firmly fixed on the plate Step 5 Electrical connections Wire up the earth connection Wire up the connectors in strict compliance with the plate wiring diagram CAUTION Reversing the wiring can serio...

Страница 24: ...eck the functions work AVR internal power supply fault Replace the AVR Restart the plate with the procedure in section 4 3 5 Control 24 VDC power supply fault Plate general fault Replace the 24 VDC po...

Страница 25: ...is available under reference P5 198 0003 5 1 2 Wiring diagrams The wring diagram for the dual plate D700 is available under reference WD 198 0003 5 2 Preventive maintenance instructions Check that th...

Страница 26: ...Electric Power Generation Installation and maintenance 5747 en 2018 10 a Dual plate D700 26...

Страница 27: ...ient repair support and maintenance services Trust your alternator maintenance and support to electric power generation experts Our field personnel are 100 qualified and fully trained to operate in al...

Страница 28: ...www leroy somer com epg 2018 10 a Linkedin com company Leroy Somer Twitter com Leroy_Somer_en Facebook com LeroySomer Nidec en YouTube com LeroySomerOfficiel 5747 en...

Отзывы: