Electric Power Generation 

Installation and maintenance 

5747 en - 2018.10 / a 

Dual plate D700 

 

 

 

18 

Step  2

:  The  active  AVR  will  be  the  reference  for  voltage  and  current  measurements.  The  accuracy  of  its 

readings  should  therefore  be  checked  against  any  devices  present  on  the  customer's  premises  (instruments 
measuring voltage, current, power factor, etc.). 
 

Step 3

: Aligning the voltage measurements 

  Do not apply load to the machine. 

  Check  the  voltage  reading  on  both  AVRs,  either  with  EasyReg  Advanced  by  connecting  to  both  AVRs  in 

succession, or on the HMI display unit. If the voltage on the "waiting" AVR is incorrect (±1% of the voltage on 
the "active" AVR), correct this by changing the primary or secondary values of the generator voltage sensing 
transformer (General machine configuration). 

 

Step 4

: Setting the stator current  

  If  possible,  apply  a  load  representing  more  than  25%  of  the  generator  rated  power  (this  operation  can  be 

done in voltage, power factor or kVAr mode).  

  Check the stator current reading on both AVRs, either with EasyReg Advanced by connecting to both AVRs 

in succession, or on the HMI display unit. If the stator current measurement of the "waiting" AVR is incorrect 
(±1% of the current on the "active" AVR), correct this by changing the primary or secondary values of the 
main stator current transformers and/or isolating transformers (General machine configuration). 
 

Step 5

: Setting the PF 

  With the same load, check the PF measurement on the waiting AVR. If the power factor measurement on the 

"waiting" AVR is incorrect (±0.01 compared to that on the "active" AVR), correct this by changing the phase 
shift on the parallel operation CT. 
 

Step 6

: Stop the installation. 

 

4.  Instructions for use 

This plate has been developed to switch automatically from an "active" AVR 1 to an "online" AVR 2, if a fault is 
detected on AVR 1. Manual switching is possible, however. 

4.1.  Safety instructions 

Before  using  the  plate  for  the  first  time,  please  refer  to  the  instructions  and  make  sure  that  operations  are 
performed in accordance with the safety measures in paragraph 1.4.  

4.2.  Description of control and signalling devices 

The plate does not have any control and signalling devices apart from on the AVR HMI.  

4.3.  Description of running modes 

4.3.1.  Manual switching 

As previously mentioned, the AVRs can be switched manually with the "Maintenance" input on each AVR. 
These inputs depend on the relays on the plate which prevent both AVRs being set to maintenance mode 
simultaneously.  
 
The plate therefore has 4 contact inputs: 

  Terminals XC.1 and XC.2: AVR 1 maintenance 

  Terminals XC.2 and XC.3: AVR 1 maintenance reset 

  Terminals XC.4 and XC.5: AVR 2 maintenance 

  Terminals XC.5 and XC.6: AVR 2 maintenance reset 

 
 
 
 
 
 

Содержание Leroy-Somer D700

Страница 1: ...Dual plate Installation and maintenance D700...

Страница 2: ......

Страница 3: ...of the cabinet housing the dual plate 10 2 2 Connection block 10 2 3 Consumption 13 2 4 Wiring precautions 13 3 Setup instructions 14 3 1 Stator voltage and current measurement 14 3 2 Configuration fi...

Страница 4: ...s for 10 seconds maximum 1 This plate has been designed to be installed in a control and power switching cabinet These cabinets must provide the minimum conditions for protection and safety of electri...

Страница 5: ...of the generator field circuit Two freewheel diode modules connected on the field circuit to ensure it never opens All the controls 9 configurable inputs hard wired to deliver the same information to...

Страница 6: ...ge 50 400 VDC 110 max 2 minutes Consumption 3000 VA Field current Rated 0 25 A Short circuit max 50 A at 25 C Field winding resistance 4 Ohm Frequency measurement Range 30 400 Hz For the plate 3 auxil...

Страница 7: ...Electric Power Generation Installation and maintenance 5747 en 2018 10 a Dual plate D700 7 Fixings 371 32 28 8 352 06 CG CG 750 750 119 5 725 725...

Страница 8: ...ally the prevention of direct or indirect contact when the plate is powered up LEROY SOMER declines all responsibility in the event of the above recommendations not being observed The various interven...

Страница 9: ...cation of the clearance between components during transportation and handling Avoid touching the electronic components and contact parts The dual plate D700 contains parts which are sensitive to elect...

Страница 10: ...you with any additional information you may require This manual is to be given to the end user 1 4 8 Protection of the equipment Auxiliary power supplies for the AVRs and the control circuit which ar...

Страница 11: ...1 XM 13 Phase NW2 L2 XM 15 Phase NW3 L3 XM 12 Phase NW1 L1 Mains voltage measurement AVR 2 XM 14 Phase NW2 L2 XM 16 Phase NW3 L3 XP 1 Power X1 Field power AVR 1 XP 3 Power X2 XP 5 Power Z1 XP 7 Power...

Страница 12: ...nd AVR 1 and 2 XC 16 Plate 24VDC XC 17 DI6 input command AVR 1 and 2 XC 18 Plate 24VDC XC 19 DI7 input command AVR 1 and 2 XC 20 Plate 24VDC XC 21 DI8 input command AVR 1 and 2 XC 22 Plate 24VDC XC 23...

Страница 13: ...cable length must never exceed 100 m To ensure compliance with standards IEC 61000 6 2 IEC 61000 6 4 and IEC 60255 26 shielded cables are essential in the case of a D700 installed outside the termina...

Страница 14: ...nd to the technical and electrical data of the generator on which the plate is to be installed It is therefore important to pay particular attention to the following settings Generator power rated vol...

Страница 15: ...is checked In both cases the drawing on the right is updated with the appearance of a second D700 On the Protections page the following faults are automatically activated Machine fault tab reactive p...

Страница 16: ...activated if the AVR is active DO2 and DO10 are activated if the AVR is online 3 3 Checks prior to commissioning First it is necessary to check the wiring and general operation of the plate Step 1 Ins...

Страница 17: ...t breakers are closed properly in the generator Check that the status of both AVRs is OFF 3 4 Aligning measurements Once these checks have been done make sure that the measurements on both AVRs give s...

Страница 18: ...ry or secondary values of the main stator current transformers and or isolating transformers General machine configuration Step 5 Setting the PF With the same load check the PF measurement on the wait...

Страница 19: ...the serial link The regulation context is then preserved in the event of switching and running in manual mode 4 3 4 Switching on a fault Several faults can cause switching from the active AVR to the o...

Страница 20: ...a circuit which monitors the power transistors If there is a discrepancy between the transistor command and its action the active AVR switches to fault mode and the online AVR switches to active mode...

Страница 21: ...ching does not occur that may then come from the sensing VT Note By default no action has been programmed for loss of sensing A significant bump may therefore occur on switching to the online AVR This...

Страница 22: ...that may then come from a fault in the link to the exciter Note By default no action has been programmed for reactive reverse power A significant bump may therefore occur on switching to the online AV...

Страница 23: ...is firmly fixed on the plate Step 5 Electrical connections Wire up the earth connection Wire up the connectors in strict compliance with the plate wiring diagram CAUTION Reversing the wiring can serio...

Страница 24: ...eck the functions work AVR internal power supply fault Replace the AVR Restart the plate with the procedure in section 4 3 5 Control 24 VDC power supply fault Plate general fault Replace the 24 VDC po...

Страница 25: ...is available under reference P5 198 0003 5 1 2 Wiring diagrams The wring diagram for the dual plate D700 is available under reference WD 198 0003 5 2 Preventive maintenance instructions Check that th...

Страница 26: ...Electric Power Generation Installation and maintenance 5747 en 2018 10 a Dual plate D700 26...

Страница 27: ...ient repair support and maintenance services Trust your alternator maintenance and support to electric power generation experts Our field personnel are 100 qualified and fully trained to operate in al...

Страница 28: ...www leroy somer com epg 2018 10 a Linkedin com company Leroy Somer Twitter com Leroy_Somer_en Facebook com LeroySomer Nidec en YouTube com LeroySomerOfficiel 5747 en...

Отзывы: