Before proceeding with installation, check the installation dimensions (Fig. 3):

338 mm

205
mm

420
mm

1030 mm

314 mm

320
mm

205
mm

1000 mm

280
mm

286 mm

178
mm

1000 mm

3

WIDE S

WIDE M

WIDE L

To install the barrier, proceed as described below:

01.

Establish the installation position of the 

various system components (e.g. Fig. 2):

- If the base does not exist, start from step 

02
- If the base exists, start from step 06

02

06

02.

Dig the foundation ditch and prepare the 

tubes for the electrical cables: see Table 3 

for the type of cables (Section 4)

Содержание WIDEL

Страница 1: ...EN User installation and safety instructions Electromechanical road barrier WIDES WIDESI WIDEM WIDEMI WIDEL WIDELI WIDES V1 WIDESI V1 WIDEM V1 WIDEMI V1 WIDEL V1 WIDELI V1 Nice...

Страница 2: ...cast in accordance with the following harmonised standards EN 60335 1 2002 A1 2004 A11 2004 A12 2006 A2 2006 A13 2008 A14 2010 A15 2011 EN 60335 2 103 2003 A11 2009 In addition the product conforms to...

Страница 3: ...able connections 17 5 STARTING THE AUTOMATION AND CHECKING THE CONNECTIONS 5 1 Hooking the automation up to the mains 19 6 TESTING AND COMMISSIONING 6 1 Testing 21 6 2 Commissioning 22 7 PROGRAMMING 7...

Страница 4: ...Keep the product away from sources of heat and naked flames Failure to observe the above can damage the product and increase the risk of danger or malfunction If this should happen stop installation i...

Страница 5: ...ted machinery and is therefore manufactured to be integrated into a machine or assembled with other machines in order to create a machine pursuant to Machinery Directive only in combination with other...

Страница 6: ...cally moving doors Operating forces for power operated closures The operating forces exerted by the boom with regard to the risks of crushing and impact are safeguarded against by means of one of thes...

Страница 7: ...5 Force setting trimmer I above 50 5 10 10 02 Depending on the chosen barrier mech anism model proceed as follows on the graph a using the value found above draw a vertical line until it crosses the c...

Страница 8: ...box for barrier mechanism cabinet c box for small hardware d anchors e manual lock release key f Boom cap 2 caps to cover the rubber impact protectors these are found in the box for small hardware g...

Страница 9: ...8 mm 1000 mm 3 WIDE S WIDE M WIDE L To install the barrier proceed as described below 01 Establish the installation position of the various system components e g Fig 2 If the base does not exist start...

Страница 10: ...vel 05 Wait until the concrete hardens usually at least two weeks and then remove the 4 upper nuts of the anchors 06 Fixing the barrier mechanism cabinet a b unscrew the screws and remove the cover c...

Страница 11: ...B in the factory it is anchored in non definitive holes WIDE S WIDE M WIDE L 7 m A Only with 7 m boom place the balancing springs as shown in Figure A If you require RIGHT ORIENTED BOOM with the cabin...

Страница 12: ...model purchased In the factory the balancing spring is anchored in non definitive holes Move the balancing spring attachment into one of the holes on the other arm of the WIDE balance lever based on...

Страница 13: ...English 11 WIDE M WIDE M a b c d e f l 90 i h g...

Страница 14: ...English 12 7 m 7 m WIDE L WIDE L a b c d e f l 90 g h i A A Only with 7 m boom place the balancing springs as shown in Figure A...

Страница 15: ...y from this point a insert them into the free end of the boom if necessary use a rubber mallet and continue with step 10 a Assembly BOOM CONSISTING OF 2 PIECES whole or cut CAUTION With booms consisti...

Страница 16: ...he rubber impact protector and repeat for the other pieces Note The rubber impact protector can protrude about 1 cm from the end of the aluminium profile 1 cm c d put on the boom cap and secure it wit...

Страница 17: ...sitioned anchored so as to guarantee the balancing at 45 WIDE L with 6 7 m boom requires 2 balancing springs positioned anchored so as to have the balancing at 45 a manually release the gearmotor b ma...

Страница 18: ...ge and injury Fig 4 shows the hookup of a typical installation fig 5 shows the connections to be made on the control unit 4 1 Types of electrical cables Fig 4 Table 3 Types of electrical cable see fig...

Страница 19: ...ntion results in opening or closing with the sequence Open Stop Close Stop 7 14 Open Input of normally open NO type for command devices whose intervention results in an opening manoeuvre with the sequ...

Страница 20: ...STMENT TRIMMER LED FCA OPENING LIMIT SWITCH LED LED OK OK LED LIMIT SWITCH LIMIT SWITCH LED OPEN OPEN LED FLASH FLASHING LIGHT LED CLOSED CLOSED LED FUSE FUSE LED P P STEP BY STEP LED MOTOR MOTOR LED...

Страница 21: ...ns Proceed as described below 01 a manually release the gearmotor based on the model purchased b manually move the boom to about half way 45 c manually lock the gearmotor b a c WIDE S WIDE M WIDE L WI...

Страница 22: ...fectively it is necessary that the limit switch triggers at about 20 before the mechanical stopping point is reached if necessary adjust the two cams to set the desired point a b a b e d c c 20 20 LED...

Страница 23: ...Stop of the barrier mechanism and check that the movement corresponds to the commands given it is recommended that you perform several tests to assess the move ment of the boom and whether any errors...

Страница 24: ...in the end find the adjustment that provides the best results 10 Check the efficiency of the manual release system a place the boom in its closed position and perform the manual release of the gearmot...

Страница 25: ...unit the system intervenes both in opening and closing Note Since the motor needs more power at the start of each manoeuvre departure the obstacle detection system is excluded Adjustment it must be ad...

Страница 26: ...iption ON Pre flashing When a command is sent the flashing light starts flashing and after 5 seconds 2 seconds in Manual mode the movement starts OFF Disabled Switch 6 Operation Description ON Flashin...

Страница 27: ...igure below 15 14 13 12 11 10 9 8 7 6 5 24 V 30 V 0 The power supply voltage is 24V 30 to 50 with a maximum available current of 200 mA Red Light Green Light Operation OFF OFF boom closed no transit i...

Страница 28: ...X photocell inside the barrier mechanism cabinet in the space provided 01 Proceed as indicated in the image below a remove the card of the photocell from its box by levering with a screwdriver CAUTION...

Страница 29: ...a mod PS324 back up battery not supplied that in the event of a power failure supplies power to the automation for a specified time refer to the battery instruction manual CAUTION The backup battery...

Страница 30: ...o the Step by Step input is active LED OPEN Problem Solution Off All OK Open input not active On Intervention of Open input It is normal if the one of the devices connected to the Open input is active...

Страница 31: ...switch paragraph 7 2 Use in acid saline or potentially explosive atmosphere No Operating temperature 20 C 50 C Protection class IP 54 Dimensions mm 280 x 178 x 1000 H 320 x 205 x 1000 H 420 x 205 x 10...

Страница 32: ......

Страница 33: ...t of 20 kg for example a sack of gravel halfway along the length of the boom command an Opening manoeuvre and check that dur ing the manoeuvre the boom does not exceed a height of 50 cm above its clos...

Страница 34: ......

Страница 35: ...escribed below In the event of break age or power failure the automation can still be used while waiting for your installer to service the system or for the power to be restored even if it does not ha...

Страница 36: ...www niceforyou com IDV0384A04EN_20 08 2018_DIGITAL VERSION Nice S p A Via Callalta 1 31046 Oderzo TV Italy info niceforyou com...