8.
M
AIN TE N AN CE
D
E TAI LS
WARNING!
Failure to maintain equipment may result in injury or death and/or damage to property and equipment
Recommended maintenance to be performed on the operator and gate are as follows:
Operator performs over 150 cycles a day
each month
Operator performs between 100-150 cycles a day
every 2 month
Operator performs between 50-99 cycles a day
every 4 months
Operator performs between 20-49 cycles a day
every 6 months
Operator performs under 20 cycles a day
every 12 months
Date: ..........................................................................................
Site Name: .....................................................................................................................................................
Site Address: ..................................................................................................................................................
Before commencing maintenance on the operator, isolate the electrical supply to ensure operator will not run
inadvertently.
Gate rolls freely when in manual ....................................................................................
Gate wheels and guide rollers in good condition ............................................................
Gate stops are installed and in good condition, not loose ...............................................
Gate rack is tight & correct clearances between pinion wheel & rack............................
Gate track is not damaged ...............................................................................................
Gate operator mounting bolts tight..................................................................................
No oil leaks from gearboxes............................................................................................
Gearbox mounting bolts/nuts tight ..................................................................................
Inside operator and control box clean .............................................................................
‘Baygon’ Surface Spray around operator and control box (not on electronics)
..............
All electrical connections tight........................................................................................
Limit Switches operate in appropriate positions / chain oiled ........................................
External safety devices work effectively / cleaned .........................................................
Electromagnetic lock, if fitted, operates correctly and is clean ......................................
Wash down of control box and cover (particularly near corrosive/sea environments)...
General operation i.e. speed, auto close etc normal ........................................................
Comments............................ ..................................................................................................... ......
.........................................................................................................................................................
...........................................................................................................................................................
Service performed by :......................................................................................................................
Содержание GDS 450LI
Страница 7: ...7 PLAN VIEW LAYOUT CONDUIT POSITION...