Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must be
carried out by a suitably qualified person.
Date
Signature
Notes
Description
✔
Heat pump (page 11)
Shut off valves
Venting valve
Shut off valve
Hot water (page 11)
Shut off valves
Expansion vessel
T&P valve
Tundish
Cold water (page 11)
Shut off valves
Non-return valve
Mixing valve
Safety valve
Tundish
Electricity (page 13)
Hot water sensor
Temperature limiter
Miscellaneous
Benchmark checklist
5
Chapter 1 |
Important information
VPB 200N
...............................................................................................................................
...............................................................................................................................
............................................................................................................................
.
Содержание VPB 200N
Страница 1: ...Installer manual LEK VPB 200N Hot water heater IHB GB 1046 3 031453...
Страница 2: ......
Страница 6: ...VPB 200N Chapter 1 Important information 4...
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......