background image

General

Pipe installation must be carried out in accordance with
current norms and directives.

Internal support bushes should be fitted when a plastic
pipe or annealed copper pipe is used. The water heater
must be fitted with the requisite valves, such as a safety
valve, shut-off valve, non-return valve, and vacuum valve.
An overflow pipe must be routed from the safety valve
to a suitable drain. The size of the overflow pipe must be
the same as on the safety valve. Route the overflow pipe
from the safety valve enclosed along its entire length and
ensure that it is frost proof. The outlet of the overflow
pipe should be visible and clearly away from any electrical
components.

Overflow water from the safety valves goes via non-
pressurised collecting pipes to a drain so that hot water
splashes cannot cause injury. These non-pressurised col-
lecting pipes shall not be used for anything else. A dis-
charge pipe from the tundish connected to the expansion
relief valve (safety valve) shall also be connected to a drain
in the same way.

Please note that the connection of the T&P-valve should
not be used for any other purpose.

Valves may not be positioned between the expansion
valve and the vessel.

Discharge pipes from tundishes shall have av vertical
section of pipe at least 300 mm long, before any elbows
or bends in the pipework (see following picture).

500 mm maximum

300 mm 
minimum

Tundish

Metal discharge pipe from
temperature relief valve to tundish.

Metal discharge pipe from tundish,
with continous fall.

Discharge below
fixed grating.

Fixed grating

Trapped gulley

Possible wall

Safety device
(e.g. temperature
relief valve).

Resistance created by
each elbow or bend

Maximum resistance
allowed, expressed
as a lenght of
straight pipe (i.e. no
elbows or bends)

Minimum size of dis-
charge pipe from
tundish

Minimum size of dis-
charge pipe

Valve outlet size

0.8 mm

up to 9 m

22 mm

15 mm

G1/2

1.0 mm

up to 18 m

28 mm

15 mm

G1/2

1.4 mm

up to 27 m

35 mm

15 mm

G1/2

1.0 mm

up to 9 m

28 mm

22 mm

<G3>/4

1.4 mm

up to 18 m

35 mm

22 mm

<G3>/4

1.7 mm

up to 27 m

42 mm

22 mm

<G3>/4

1.4 mm

up to 9 m

35 mm

28 mm

G1

1.7 mm

up to 18 m

42 mm

28 mm

G1

2.3 mm

up to 27 m

54 mm

28 mm

G1

Hard water areas

Usually, there should not be a problem in installing VPB
200N in areas of hard water as the operating temperature
is 50-60 °C.

Cleaning the climate system

When the water heater and the climate system have been
filled with water, VPB 200N must operate at maximum
normal temperature for at least one hour. Thereafter the
system must be drained of water and refilled.

Emptying the system by

1.

Open the filling valve and the drain valve for the cli-
mate system.

2.

Flush the system for some minute. Watch out for
water splashes from the safety valve.

3.

Close the valves and check the stainer.

VPB 200N

Chapter 4 |

Pipe connections

10

4 Pipe connections

Содержание VPB 200N

Страница 1: ...Installer manual LEK VPB 200N Hot water heater IHB GB 1046 3 031453...

Страница 2: ......

Страница 3: ...1 Heat pump 11 Cold and hot water 11 Installation alternative 12 5 Electrical installation 13 Sensors 13 Temperature limiter 13 Immersion heater 13 6 Commissioning and adjusting 14 Filling and venting...

Страница 4: ...t information about what you should observe when maintain ing your installation TIP This symbol indicates tips on how to facilitate using the product Marking VPB 200N is CE marked and fulfils IP21 The...

Страница 5: ...E guarantee is based on the unit being installed and commissioned by a NIBE accredited installer serviced every year and the Benchmark documents completed Where this condition is not met any chargeabl...

Страница 6: ...VPB 200N Chapter 1 Important information 4...

Страница 7: ...son Date Signature Notes Description Heat pump page 11 Shut off valves Venting valve Shut off valve Hot water page 11 Shut off valves Expansion vessel T P valve Tundish Cold water page 11 Shut off val...

Страница 8: ...can bear its weight preferably on a concrete floor or founda tion Use the water heater s adjustable feet to obtain a horizontal and stable set up Pipes must be routed from the safety valve to a suit a...

Страница 9: ...ssure reduction valve LEK LEK Connector with cable Armoured hose expansion vessel LEK LEK Expansion vessel with holder Shut off valve Location The kit of supplied items is placed on top of the product...

Страница 10: ...LEK XL9 UL UA2 XL8 FD1 UA1 XL5 PF3 XL3 XL4 FL5 QM3 EB1 QQ1 VPB 200N Chapter 3 The water heater design 8 3 The water heater design...

Страница 11: ...AC components T P valve FL5 Drain valve hot water G QM3 Inspection cover hole 80 QQ1 Submerged tube for hot water sensor display UA1 Submerged tube for hot water sensor control UA2 Electrical componen...

Страница 12: ...bends in the pipework see following picture 500 mm maximum 300 mm minimum Tundish Metal discharge pipe from temperature relief valve to tundish Metal discharge pipe from tundish with continous fall D...

Страница 13: ...nnected to VPB 200N Cold and hot water Connecting cold and hot water There must be a mixing valve if the temperature can ex ceed 60 C The flexible hose to the expansion vessel can be installed in the...

Страница 14: ...em Installation alternative VPB 200N can be connected in several different ways one of which is shown here Further option information is available at www nibe co uk and in the respective assembly inst...

Страница 15: ...UA2 and ensure that the sensor is in the sub merged tube fully and that the cover disc is sealed The bulb for the temperature limiter is in the submerged tube for the display sensor Any sensors must b...

Страница 16: ...not included with the product Fill the coil in the hot water heater and the rest of the climate system with water 2 Open the external venting valve 3 When the water that exits the external venting val...

Страница 17: ...ure and channel T3 return temperature is adjusted using the circulation pump and control valve Adjustment is made when the flow temperature is approx 45 C and at stable operation 5 minutes after start...

Страница 18: ...t any fault before continuing Service actions Safety valves The function of the safety valves must be checked regu larly Perform checks as follows 1 Open the valve by turning the knob anti clockwise c...

Страница 19: ...Dimensions and setting out coordinates 1230 43 30 65 260 570 980 17 Chapter 8 Technical data VPB 200N 8 Technical data...

Страница 20: ...t water temperature 70 minutes Heating time 15 C to 60 C 8 kW charge power 50 minutes Reheating after draining 140 litres 8 kW charging power 6 0 6 bar MPa Max pressure primary side 6 0 6 bar MPa Max...

Страница 21: ...the installation 5 Installation alternative 12 To ground source heat pump 12 Installation area 6 M Maintenance 16 General inspection 16 Hot water heater 16 Marking 2 P Pipe connections 10 Cleaning the...

Страница 22: ...pressure relief valve and expansion valve been tted and discharge tested Yes No The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations Yes Are all...

Страница 23: ...mments Signature SERVICE 3 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 4 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 5 Date Engineer Nam...

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ...NIBE Energy Systems Ltd 3C Broom Business Park Bridge Way Chesterfield S41 9QG Phone 0845 095 1200 Fax 0845 095 1201 info nibe co uk www nibe co uk...

Отзывы: