background image

MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST

*

ll

A

   installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme.  
A Building Regulations Compliance Certificate will then be issued to the customer.  

©Heating and Hotwater Industry Council (HHIC)   

 

 

 

              www.centralheating.co.uk

ALL SYSTEMS PRIMARY SETTINGS

 (indirect heating only) 

Is the primary circuit a sealed or open vented system? 

Sealed 

  Open 

 

What is the maximum primary flow temperature? 

 

°C

ALL SYSTEMS 

What is the incoming static cold water pressure at the inlet to the system? 

 

bar

Has a strainer been cleaned of installation debris (if fitted)? 

Yes 

  No 

Is the installation in a hard water area (above 200ppm)? 

Yes 

  No 

If yes, has a water scale reducer been fitted? 

Yes 

  No 

What type of scale reducer has been fitted? 

What is the hot water thermostat set temperature? 

 

°C

What is the maximum hot water flow rate at set thermostat temperature (measured at high flow outlet)? 

  

l/min

Time and temperature controls have been fitted in compliance with Part L of the Building Regulations? 

 

Yes 

 

Type of control system (if applicable) 

Y Plan 

 

S Plan 

 

Other 

 

Is the cylinder solar (or other renewable) compatible? 

Yes 

  No 

What is the hot water temperature at the nearest outlet? 

 

°C

All appropriate pipes have been insulated up to 1 metre or the point where they become concealed 

 

Yes 

 

UNVENTED SYSTEMS ONLY 

Where is the pressure reducing valve situated (if fitted)?

What is the pressure reducing valve setting?  

 

bar

Has a combined temperature and pressure relief valve and expansion valve been fitted and discharge tested? 

Yes 

  No 

The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations 

 

Yes 

Are all energy sources fitted with a cut out device? 

Yes 

  No 

Has the expansion vessel or internal air space been checked? 

Yes 

  No 

THERMAL STORES ONLY 

What store temperature is achievable? 

 

°C

What is the maximum hot water temperature? 

 

°C

ALL INSTALLATIONS 

 

The hot water system complies with the appropriate Building Regulations 

Yes 

 

The system has been installed and commissioned in accordance with the manufacturer’s instructions 

Yes 

 

The system controls have been demonstrated to and understood by the customer 

Yes 

 

The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer 

Yes 

 

Commissioning Engineer’s Signature

Customer’s Signature

(To confirm satisfactory demonstration and receipt of manufacturer’s literature)

This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of 
demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.  

Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.      

Customer Name  

Telephone Number

Address 

Cylinder Make and Model 

Cylinder Serial Number 

Commissioned by 

(print name)

 

Registered Operative ID Number

Company Name 

Telephone Number

Company Address

 

 

Commissioning Date 

To be completed by the customer on receipt of a Building Regulations Compliance Certificate

*

:

Building Regulations Notification Number 

(if applicable)

Содержание VPB 200N

Страница 1: ...Installer manual LEK VPB 200N Hot water heater IHB GB 1046 3 031453...

Страница 2: ......

Страница 3: ...1 Heat pump 11 Cold and hot water 11 Installation alternative 12 5 Electrical installation 13 Sensors 13 Temperature limiter 13 Immersion heater 13 6 Commissioning and adjusting 14 Filling and venting...

Страница 4: ...t information about what you should observe when maintain ing your installation TIP This symbol indicates tips on how to facilitate using the product Marking VPB 200N is CE marked and fulfils IP21 The...

Страница 5: ...E guarantee is based on the unit being installed and commissioned by a NIBE accredited installer serviced every year and the Benchmark documents completed Where this condition is not met any chargeabl...

Страница 6: ...VPB 200N Chapter 1 Important information 4...

Страница 7: ...son Date Signature Notes Description Heat pump page 11 Shut off valves Venting valve Shut off valve Hot water page 11 Shut off valves Expansion vessel T P valve Tundish Cold water page 11 Shut off val...

Страница 8: ...can bear its weight preferably on a concrete floor or founda tion Use the water heater s adjustable feet to obtain a horizontal and stable set up Pipes must be routed from the safety valve to a suit a...

Страница 9: ...ssure reduction valve LEK LEK Connector with cable Armoured hose expansion vessel LEK LEK Expansion vessel with holder Shut off valve Location The kit of supplied items is placed on top of the product...

Страница 10: ...LEK XL9 UL UA2 XL8 FD1 UA1 XL5 PF3 XL3 XL4 FL5 QM3 EB1 QQ1 VPB 200N Chapter 3 The water heater design 8 3 The water heater design...

Страница 11: ...AC components T P valve FL5 Drain valve hot water G QM3 Inspection cover hole 80 QQ1 Submerged tube for hot water sensor display UA1 Submerged tube for hot water sensor control UA2 Electrical componen...

Страница 12: ...bends in the pipework see following picture 500 mm maximum 300 mm minimum Tundish Metal discharge pipe from temperature relief valve to tundish Metal discharge pipe from tundish with continous fall D...

Страница 13: ...nnected to VPB 200N Cold and hot water Connecting cold and hot water There must be a mixing valve if the temperature can ex ceed 60 C The flexible hose to the expansion vessel can be installed in the...

Страница 14: ...em Installation alternative VPB 200N can be connected in several different ways one of which is shown here Further option information is available at www nibe co uk and in the respective assembly inst...

Страница 15: ...UA2 and ensure that the sensor is in the sub merged tube fully and that the cover disc is sealed The bulb for the temperature limiter is in the submerged tube for the display sensor Any sensors must b...

Страница 16: ...not included with the product Fill the coil in the hot water heater and the rest of the climate system with water 2 Open the external venting valve 3 When the water that exits the external venting val...

Страница 17: ...ure and channel T3 return temperature is adjusted using the circulation pump and control valve Adjustment is made when the flow temperature is approx 45 C and at stable operation 5 minutes after start...

Страница 18: ...t any fault before continuing Service actions Safety valves The function of the safety valves must be checked regu larly Perform checks as follows 1 Open the valve by turning the knob anti clockwise c...

Страница 19: ...Dimensions and setting out coordinates 1230 43 30 65 260 570 980 17 Chapter 8 Technical data VPB 200N 8 Technical data...

Страница 20: ...t water temperature 70 minutes Heating time 15 C to 60 C 8 kW charge power 50 minutes Reheating after draining 140 litres 8 kW charging power 6 0 6 bar MPa Max pressure primary side 6 0 6 bar MPa Max...

Страница 21: ...the installation 5 Installation alternative 12 To ground source heat pump 12 Installation area 6 M Maintenance 16 General inspection 16 Hot water heater 16 Marking 2 P Pipe connections 10 Cleaning the...

Страница 22: ...pressure relief valve and expansion valve been tted and discharge tested Yes No The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations Yes Are all...

Страница 23: ...mments Signature SERVICE 3 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 4 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 5 Date Engineer Nam...