Country specific information
Installer manual
This installer manual must be left with the customer.
Great Britain
This installation is subject to building regulation approval,
notify the local Authority of intention to install.
Use only manufacturer’s recommended replacement
parts.
Benchmark places responsibilities on both manufacturers
and installers. the purpose is to ensure that customers
are provided with the correct equipment for their needs,
that it is installed, commissioned and serviced in accord-
ance with the manufacturers instructions by competent
persons and that it meets the requirements of the appro-
priate Building Regulations. The Benchmark Checklist can
be used to demonstrate compliance with Building Regu-
lations and should be provided to the customer for future
reference.
Installers are required to carry out the installation, com-
missioning and servicing work in accordance with the
Benchmark Code of practice which is available from the
Heating and Hotwater Industry Council who manage and
promote the Scheme. Visit www.centralheating.co.uk for
information.
Warranty information
Thank you for installing a new NIBE heat pump in your
home.
NIBE heat pumps are manufactured in Sweden to the
very highest standard so we are pleased to offer our
customers a comprehensive guarantee.
The product is guaranteed for 24 months for parts and
labour from the date of installation or 33 months from
the date of manufacture, whichever is the shorter.
The NIBE guarantee is based on the unit being installed
and commissioned by a NIBE accredited installer, serviced
every year and the Benchmark documents completed.
Where this condition is not met, any chargeable spare
parts or components issued within the applicable guaran-
tee period still benefit from a 12 month warranty from
the date of issue by the manufacturer.
We recommend the installer completes and returns as
soon as possible, your guarantee registration card or
completes the guarantee form on the NIBE website
www.nibe.co.uk.
Please ensure that the installer has fully completed the
Benchmark Checklist in the end of the Installation Instruc-
tions supplied with the product and that you have signed
to say that you have received a full and clear explanation
of its operation. The installer is legally required to com-
plete a commissioning checklist as a means of complying
with the appropriate Building Regulations (England and
Wales).
All installations must be notified to Local Area Building
Control either directly or through a Competent Persons
Scheme. A Building Regulations Compliance Certificate
will then be issued to the customer who should, on re-
ceipt, write the Notification Number on the Benchmark
Checklist.
This product should be serviced regularly to optimise its
safety, efficiency and performance. The service engineer
should complete the relevant Service Record on the
Benchmark Checklist after each service.
The Benchmark Checklist may be required in the event
of any warranty work and as supporting documentation
relating to home improvements in the optional documents
section of the Home Information Pack.
3
Chapter 1 |
Important information
VPB 200N
Содержание VPB 200N
Страница 1: ...Installer manual LEK VPB 200N Hot water heater IHB GB 1046 3 031453...
Страница 2: ......
Страница 6: ...VPB 200N Chapter 1 Important information 4...
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......