New Rock Technologies MX100-AG Скачать руководство пользователя страница 7

Shanghai New Rock Technologies, Inc.                                                     

Page 7/23 

 

Installation Preparation 

1.1 

 Installation Preparations 

1.1.1 

  Collecting the Technical Documents 

The technical documents, include network diagram, equipment room facility plan, installation design 
drawings, wiring drawings, etc, should be provided by the party who is responsible for preparing the 
documents under the request of purchasing party. Copies of the documents should be provided by the 
purchasing party to the gateway supplier prior to the shipment. 
This manual and < Operation Manual for MX Gateway Series > should be provided to the purchase 
party in the shipment. 
A <Site Survey Report> must be completed prior to the installation. When all required conditions are 
satisfied, <Installation Project Agreement> should then be prepared and signed-off, and <Installation 
Project Plan> should be prepared. 

1.1.2 

  Tools and Meters 

The tools and meters listed in table 1-1 are required for the installation. 
Table 1-1 Tools and Meters for the Project 

Items  
Philips Screwdriver 
Slotted Screwdrivers 
Diagonal Cutter   
RJ45 & RJ11 Crimping Tool 
Wire Stripper 
RJ45/RJ11 Cable Tester   
Angle Square 
Spirit Level 
Multimeter 
Antistatic wrist strap 
Cable Tie 
Gloves 
Antistatic Gloves 

 

1.2 

Site Requirements 

1.2.1 

  Temperature and Humidity 

Check the temperature and humidity of equipment room. To ensure the normal operation and long 
service life of the gateway, the temperature and humidity in the room should be kept at the proper 
range. 
The humidity in the equipment room should be kept between 10% and 90% (non-condensing). 
Abnormal humidity condition may cause problems to the gateway: 

z

 

Long term high humidity may lead to bad insulation and even cause electricity leakage, 
mechanical property change and corrosion. 

z

 

Low humidity is likely to leave captive screws to loose due to static electricity built up and the 
insulation washer shrunk. 

 

Содержание MX100-AG

Страница 1: ...MX Voice Gateway Series Installation Manual...

Страница 2: ...Shanghai New Rock Technologies Inc Page 2 23 Revision Record Revision version 1 0 2009 05 07 Author ZNH The first revision...

Страница 3: ...l MX8 on the Workbench 12 2 2 2 Install MX51 MX100 AG and MX120 on the Workbench 12 2 3 Rack Mounting 12 2 3 1 Attaching the Brackets 12 2 3 2 Mounting the Gateway 13 2 3 3 Installation of MX120 Serie...

Страница 4: ...anghai New Rock Technologies Inc Page 4 23 4 1 Wiring Scheme for MX100 AG CHAMP Connectors 21 4 2 Wiring Scheme for MX120 Gateway 22 4 3 Standard Table for Lead Wire of Pin at Configuration Port CON 2...

Страница 5: ...o Rack 13 Figure 2 5 Front Panel of Double chassis System of MX120 Series 14 Figure 2 6 Back Panel of Double chassis System of MX120 Series 14 Figure 2 7 Connect to the FXS interface of MX8 and MX51 S...

Страница 6: ...able 1 6 Standard Configuration of MX120 10 Table 2 1 Composition of Double chassis System of MX120 Series 13 Table 2 2 Definition on Numbers of Interface Slots of MX120 System 14 Table 4 1 Wiring Sch...

Страница 7: ...d be prepared 1 1 2 Tools and Meters The tools and meters listed in table 1 1 are required for the installation Table 1 1 Tools and Meters for the Project Items Philips Screwdriver Slotted Screwdriver...

Страница 8: ...or 220V 100V 240V 47Hz 63Hz 50W MX100 AG 110V or 220V 100V 240V 47Hz 63Hz 75W MX120 Main Chassis 110V or 220V 100V 240V 47Hz 63Hz 75W MX120 Expansion Chassis 110V or 220V 100V 240V 47Hz 63Hz 50W MX8...

Страница 9: ...ter switch cable wiring and etc and make sure they are ready for the gateway AC Power Outlets The gateway needs AC power supply and sometimes the power is provided through a power strip with extension...

Страница 10: ...C250V 10A 1 Single or 2 Duplex Set Rack Mounting Kits Set 1 Single or 2 Duplex Set The packaging list in this document is only for reference Changes may be made without notification The detailed inclu...

Страница 11: ...es that need installing on the workbench the installation flow is shown in the Figure 2 1 Figure 2 1 Installation Flowchart on the Workbench 2 1 2 Installation Flowchart in the Cabinet For MX51 MX100...

Страница 12: ...ipment on the middle of the workbench 2 3 Rack Mounting The MX51 MX100 AG and MX120 series chassis are designed to be mounted on a standard 19 inch rack with 1U height 2 3 1 Attaching the Brackets Pla...

Страница 13: ...gateway is in level position and securely fixed as shown in Figure 2 4 Figure 2 4 Mount MX100 AG to Rack The gateway chassis is securely attached to the rack by the rack mounting brackets and the sup...

Страница 14: ...sion plans should reserve a position for the expansion chassis in installing a single chassis originally 2 4 Connecting the Ethernet Cable Connect one end of the Ethernet cable to the Ethernet port of...

Страница 15: ...ble identity the interface type in each port of the interface card be sure to match the line type at far end to port at equipment side Insertion and extraction of the interface card must be done under...

Страница 16: ...r Step 3 Through the interconnection of the patch panel the other end of the FXS interface connects with the telephones fax machines or other equipments Figure 2 9 FXS Interface Cable Connecting MX120...

Страница 17: ...ects with the telephones fax machines or the trunk lines of PBX The other end of the FXO interface connects with the extension lines of PBX or the PSTN lines Figure 2 10 FXS FXO Interface Cable Connec...

Страница 18: ...rotective earth contact and the earth contact of the AC power source is proper grounded Please contact the gateway supplier if the power LED does not light up after the power is turned on Never instal...

Страница 19: ...Shanghai New Rock Technologies Inc Page 19 23...

Страница 20: ...ble z Check whther the Ethernet cable the FXS and FXO cables are connected properly z Check whether the grouding cable is connected properly z Check whether the power cord is connected to the proper p...

Страница 21: ...XO FXO FXS 7 Red 32 Orange 7 FXS FXO FXO FXS 8 Red 33 Green 8 FXS FXO FXO FXS 9 Red 34 Brown 9 FXS FXO FXS FXS 10 Red 35 Gray 10 FXS FXO FXS FXS 11 Black 36 Blue 11 FXS FXO FXS FXS 12 Black 37 Orange...

Страница 22: ...eaded out and their correspondence relation is shown as the table below Category 5 cable is used for connecting interface card port and the patch panel frame Standard RJ11 telephone line may be insert...

Страница 23: ...with m in these interfaces will be bypassed to FXO line numbered with m 12 and so the terminal devices attached to FXS lines will be connected to matching external lines attach to FXO ports z Accordi...

Отзывы: