6 - MAINTENANCE
Grease points (Boom and arm)
Grease the boom, the arm, the bucket cylinder pin (head side), and the boom swing post every
250 h
(after the
break-in period).
Lubricant:
M
ULTI
-P
URPOSE
M
OLY
G
REASE
E
XTREME PRESSURE AND ANTI
-
WEAR
NGLI-2
SMIL18MEX0144FA
1
Boom cylinder (head and rod side): two grease fittings
Arm cylinder pin (head and rod side): two grease fittings
Boom connection pin: one grease fittings
Boom and arm connection pin: one grease fitting
Boom swing post - upper frame connection: two grease
fittings
Bucket cylinder pin (head side): one grease fitting
NOTICE:
if you operate the machine in water or mud, you
must lubricate the boom, the arm, the bucket cylinder pin
(head side), and the swing system every
10 h
.
6-42
Содержание E37C
Страница 70: ...3 CONTROLS AND INSTRUMENTS Footrest SMIL19MEX0775BA 17 3 12 ...
Страница 146: ...5 TRANSPORT OPERATIONS 5 8 ...
Страница 226: ...6 MAINTENANCE 6 80 ...
Страница 230: ...7 TROUBLESHOOTING 7 4 ...
Страница 233: ...8 SPECIFICATIONS Number of rollers and shoes on each side Upper roller 1 Lower roller 4 Track shoes 44 8 3 ...
Страница 238: ...8 SPECIFICATIONS 8 8 ...
Страница 292: ...9 ACCESSORIES 9 54 ...