5 - TRANSPORT OPERATIONS
1. Check the weight, length, width and height of the ma-
chine referring to the chapter 2, specification when you
are going to hoist the machine.
2. Use long wire rope and stay to keep the distance with
the machine as it should avoid touching with the ma-
chine.
3. Put a rubber plate contact with wire rope and machine
to prevent damage.
4. Place crane on the proper place.
5. Install the wire rope and stay like the illustration.
6. The maximum angle of the front wire rope must not
exceed 60 degrees and the angle of the rear wire rope
45 degrees.
NOTE:
If there is no stay, keep the angle of the rear
wire rope below 15 degrees to avoid interference with
the machine.
NOTICE:
it is imperative to use the sling points indi-
cated by the machine decals.
NOTICE:
the machine must be handled very slowly
and horizontally.
NOTICE:
keep the wire rope lifting angle below 45°.
(A)
Wire rope
(B)
Stay
(C)
Boom hoisting point
(D)
Dozer blade hoisting point
SMIL19MEX0782BA
1
5-6
Содержание E37C
Страница 70: ...3 CONTROLS AND INSTRUMENTS Footrest SMIL19MEX0775BA 17 3 12 ...
Страница 146: ...5 TRANSPORT OPERATIONS 5 8 ...
Страница 226: ...6 MAINTENANCE 6 80 ...
Страница 230: ...7 TROUBLESHOOTING 7 4 ...
Страница 233: ...8 SPECIFICATIONS Number of rollers and shoes on each side Upper roller 1 Lower roller 4 Track shoes 44 8 3 ...
Страница 238: ...8 SPECIFICATIONS 8 8 ...
Страница 292: ...9 ACCESSORIES 9 54 ...