
Upgrading Your Server 9-49
Processor (CPU)
The server may have another CPU installed in addition to the factory-installed CPU (Intel
Xeon
Processor).
IMPORTANT:
The CPU is extremely sensitive to static electricity. Make sure to
touch the metal frame of the server to discharge static electricity
from your body before handling the CPU. Do not touch the CPU
pins by a bare hand or place the CPU directly on the desk. For static
notes, see the section "Anti-static Measures" described earlier.
Do not operate the system until confirming that the additionally
installed CPU is in normal state.
Make sure to use the CPU authorized by NEC. Installing a third-
party CPU may cause a failure of the CPU as well as the mother
board. Repair of the server due to failures or damage resulted from
installing such a board will be charged.
REAR
FRONT
Mother board
CPU #1
(factory-installed)
CPU #2
(option)
Содержание Express5800/T120a-E N8100-1531F
Страница 34: ...2 4 General Description 2 5 inch Disk Model 1 Additional slot 1 Additional slot 2 4 5 6 7 8 2 3 9 10 ...
Страница 56: ...2 26 General Description This page is intentionally left blank ...
Страница 70: ...3 14 Setting Up Your Server This page is intentionally left blank ...
Страница 125: ...Configuring Your Server 4 55 Property of Physical Device of Universal RAID Utility ...
Страница 166: ...4 96 Configuring Your Server 6 Click Home at the lower left of the screen to go back to WebBIOS Top Menu ...
Страница 178: ...4 108 Configuring Your Server This page is intentionally left blank ...
Страница 259: ...Installing and Using Utilities 6 9 4 Click Parameter File Creator Parameter File Creator will appear ...
Страница 276: ...6 26 Installing and Using Utilities This page is intentionally left blank ...
Страница 290: ...7 14 Maintenance This page is intentionally left blank ...
Страница 399: ...Upgrading Your Server 9 53 11 Bring down the lever to secure the CPU 12 Remove the protective cover from the heat sink ...
Страница 416: ...9 70 Upgrading Your Server This page is intentionally left blank ...
Страница 428: ...A 4 Specifications This page is intentionally left blank ...
Страница 436: ...C 2 IRQ This page is intentionally left blank ...
Страница 475: ...Installing Windows Server 2008 D 39 4 Activate Windows The Windows activation is complete ...
Страница 538: ...G 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank ...
Страница 542: ...H 4 Product Configuration Record Table This page is intentionally left blank ...