2. Installation and Connection
Express5800/R320c-E4, R320c-M4 User's Guide
65
Chapter 2 Preparation
3. Remove one screw from the AC lock bracket on the
rear of the tower conversion kit.
4. Remove the AC lock bracket.
5. Remove two CPU/IO modules from the chassis.
6. Remove the DVD drive unit from the chassis.
7. Remove the rack mount bracket (handle) from the front of chassis.
You cannot close the door with the handle being mounted.
Keep the removed handle and screws carefully. They are needed when installing the server in rack.
8. Insert the chassis from the front side of the tower
conversion kit.
Note
Push the chassis to the end of tower conversion
kit.
AC lock bracket