2. Installation and Connection
Express5800/R320c-E4, R320c-M4 User's Guide
64
Chapter 2 Preparation
2.3.2
Installing the Rack-mount Model to the Tower Conversion Kit
Follow the procedure below to install the devices to the tower conversion kit.
CAUTION
Be sure to observe the following precautions to use the server safely. Failure to
observe the precautions may cause burns, injury, and property damage. For
details, refer to Safety precautions in Precautions for Use.
Do not drop the server.
4U chassis weighs about 10 kgs. At least two persons are required to install
it.
CPU/IO module weighs about 18 kgs. At least two persons are required to
install it.
Do not leave the CPU/IO module of the server being pulled out.
Do not install the CPU/IO module with its cover removed.
Do not get your fingers caught.
1. Open the front door of the tower conversion kit.
Tips
If the door is locked, use the provided security
key to unlock.
2. Confirm the location of 4 core nuts on the front of the
chassis.
See the figure on the right for locations of the core nuts
(2 on the front top and 2 on the front bottom.)
Tips
4 core nuts have been installed on the front of the
chassis at shipment.
Tower conversion kit (on the front top)
Tower conversion kit (on the front bottom)