Configuring Your EcoPowerGateway 4-25
BMC LAN1 Configuration submenu
Option
Parameter
Description
Your Setting
LAN
Connection
Type
[Auto Negotiation]
100Mbps Full Duplex
100Mbps Half Duplex
10Mbps Full Duplex
10Mbps Half Duplex
Specify the connection type for
management LAN port.
IP Address
[192.168.001.001]
Specify an IP address for
management LAN.
Subnet Mask
[255.255.255.000]
Specify a subnet mask for
management LAN.
Default
Gateway
[000.000.000.000]
Specify a default gateway for
management LAN.
DHCP
[Disabled]
Enabled
Set to [Enabled] to obtain an IP
address from DHCP automatically. If
you intend to specify an IP address
manually, set to [Disabled].
Web Interface
HTTP
[Disabled]
Enabled
Set to [Enabled] to use HTTP
communication for Web interface.
HTTP Port
Number
[80]
Specify the TCP port number which
the management LAN uses for HTTP
communication.
HTTPS
[Disabled]
Enabled
Set to [Enabled] to use HTTPS
communication for Web interface.
HTTPS Port
Number
[443]
Specify the TCP port number which
the management LAN uses for HTTPS
communication.
Command Line Interface
Telnet
[Disabled]
Enabled
Set to [Enabled] to use Telnet
communication as a command line
interface.
Telnet Port
Number
[23]
Specify the TCP port number to be
used for Telnet communication.
SSH
[Disabled]
Enabled
Set to [Enabled] to use SSH
communication as a command line
interface.
SSH Port
Number
[22]
Specify the TCP port number to be
used for SSH communication.
Alert Interface
Alert (Primary)
[Disabled]
Enabled
Enables or disables an alert to be sent
to the primary destination.
Alert IP
(Primary)
[000.000.000.000]
Specify an IP address of the primary
destination of the managed server.
Use the IP address of NEC ESMPRO
Manager server for the primary
destination.
Alert
(Secondary)
[Disabled]
Enabled
Enables or disables an alert to be sent
to the secondary destination.
Alert IP
(Secondary)
[000.000.000.000]
Specify an IP address of the
secondary destination.
Содержание EcoPowerGateway N8142-36F
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 10: ... This page is intentionally left blank ...
Страница 16: ...vi This page is intentionally left blank ...
Страница 21: ...Notes on Using Your EcoPowerGateway 1 5 ...
Страница 23: ...Notes on Using Your EcoPowerGateway 1 7 ...
Страница 26: ...1 10 Notes on Using Your EcoPowerGateway ...
Страница 29: ...Notes on Using Your EcoPowerGateway 1 13 ...
Страница 38: ...1 22 Notes on Using Your EcoPowerGateway This page is intentionally left blank ...
Страница 56: ...2 18 General Description This page is intentionally left blank ...
Страница 136: ...A 2 Specifications This page is intentionally left blank ...