Troubleshooting 6-11
Messages displayed on lower line
When STATUS lamp is off:
On-screen
message
Description
Action
SMI Timeout
A timeout error
occurred during
system management
interrupt.
1. Take one of the following measures to reboot (reset)
the maintenance card.
* Press
Ctrl
+
Alt
+
Del
.
* Issue a command from Web browser of
EXPRESSSCOPE Engine 2 or NEC ESMPRO
Manager.
2. Take one of the following measures to power off the
maintenance card and then on.
* Press the Maintenance switch to power off the
maintenance card, then press it again to power on.
* Issue a command from Web browser of
EXPRESSSCOPE Engine 2 or NEC ESMPRO
Manager.
3. Power off the maintenance card by pressing the
POWER switch of EcoPowerGateway, then turn it on.
4. If the same error persists, contact your service
representative.
WDT Timeout
Watchdog timer
timeout error
occurred.
1. Take one of the following measures to reboot (reset)
the maintenance card.
* Press
Ctrl
+
Alt
+
Del
.
* Issue a command from Web browser of
EXPRESSSCOPE Engine 2 or NEC ESMPRO
Manager.
2. Take one of the following measures to power off the
maintenance card and then on.
* Press the Maintenance switch to power off the
maintenance card, then press it again to power on.
* Issue a command from Web browser of
EXPRESSSCOPE Engine 2 or NEC ESMPRO
Manager.
3. Power off the maintenance card by pressing the
POWER switch of EcoPowerGateway, then turn it on.
4. If the same error persists, contact your service
representative.
Processor T-
Trip
Forced power-off
occurred due to a
thermal error in
processor.
1. Check if dust or stain is adhered to the fan of the
power unit or not.
2. Check if blank cover is surely installed in the slot
which does not contain any power unit.
3. Check the ambient temperature of installation
location.
4. Take one of the following measures to reboot (reset)
the maintenance card.
* Press
Ctrl
+
Alt
+
Del
.
* Issue a command from Web browser of
EXPRESSSCOPE Engine 2 or NEC ESMPRO
Manager.
Содержание EcoPowerGateway N8142-36F
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 10: ... This page is intentionally left blank ...
Страница 16: ...vi This page is intentionally left blank ...
Страница 21: ...Notes on Using Your EcoPowerGateway 1 5 ...
Страница 23: ...Notes on Using Your EcoPowerGateway 1 7 ...
Страница 26: ...1 10 Notes on Using Your EcoPowerGateway ...
Страница 29: ...Notes on Using Your EcoPowerGateway 1 13 ...
Страница 38: ...1 22 Notes on Using Your EcoPowerGateway This page is intentionally left blank ...
Страница 56: ...2 18 General Description This page is intentionally left blank ...
Страница 136: ...A 2 Specifications This page is intentionally left blank ...