3-8 Setting Up Your EcoPowerGateway
IMPORTANT:
Be very careful not to get your finger caught in the rails.
Insert both sides of inner rails straight into the rack.
Hold the handles on both sides of the EcoPowerGateway, and install
the EcoPowerGateway carefully while making sure the installation
position.
NOTE:
At the first installation, you may feel strong friction in pushing
because the mechanical components cannot be completely engaged
with each other. Push the EcoPowerGateway intensely.
3.
Make sure that the sliding rails move smoothly by pulling the EcoPowerGateway out of
the rack and pushing it in several times.
NOTE:
To install the EcoPowerGateway in the location adjacent to the
other device, pay attention to interference. If the installing
EcoPowerGateway disturbs the other devices already been installed,
adjust the position, and install the outer rail again.
Содержание EcoPowerGateway N8142-36F
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 10: ... This page is intentionally left blank ...
Страница 16: ...vi This page is intentionally left blank ...
Страница 21: ...Notes on Using Your EcoPowerGateway 1 5 ...
Страница 23: ...Notes on Using Your EcoPowerGateway 1 7 ...
Страница 26: ...1 10 Notes on Using Your EcoPowerGateway ...
Страница 29: ...Notes on Using Your EcoPowerGateway 1 13 ...
Страница 38: ...1 22 Notes on Using Your EcoPowerGateway This page is intentionally left blank ...
Страница 56: ...2 18 General Description This page is intentionally left blank ...
Страница 136: ...A 2 Specifications This page is intentionally left blank ...