INSTALLATION CHECKLIST
Date
Name
Address
Postcode
Boiler model
Serial number
1
Is the safety cut-off mounted correctly and functioning?
Y
N
2
Is the safety cut-off triggered by pressing the red button?
Y
N
3
Is the load valve correctly installed?
Y
N
4
Is the pump installed on the correct side of the load valve (i.e. towards the
boiler)?
Y
N
5
Is the boiler temperature sensor properly mounted?
Y
N
6
Is the boiler temperature sensor sufficiently secured?
Y
N
7
Is the inside of the boiler dry?
Y
N
8
Is a draft stabilizer mounted?
Y
N
9
Does the chimney function under all draft conditions?
Y
N
Measured chimney draught with system at full power.
pascals
Chimney data plate fitted / position.
10
Does the boiler room have the correct size and permanently open fresh air
intake? (building regs part J)
Y
N
Air intake size.
cm
²
11
Has the system been ’quick calibrated’ by weighing the pellets?
Y
N
Weight of pellets in 6 minutes.
g
12
Has the client been informed about the importance of weighing the pellets, how
to weigh the pellets, and how to perform the operation using the controller?
Y
N
13
Are the burner fan and pellet dosing (chimney draught) settings appropriate?
Y
N
Fan settings.
L
M
H
14
O2 readings
L
M
H
14
Is there an owner’s manual available in the boiler room?
Y
N
15
Has the client been informed about the location of the burner grate?
Y
N
16
Has the client been informed about boiler maintenance procedures and how to
remove and insert the boiler’s cleaning system?
Y
N
17
Has the client been informed on how to change the photo sensor?
YES NO
Y
N
18
Has the client been informed on how to change the igniter?
YES NO
Y
N
19
Has a CO detector been installed to manufacturer’s instructions?
Y
N
Comments
Remedial action
required
Engineer name
Company
MCS number
HETAS number
Signed