background image

 

 

Ready To Burn

 

Ready To Burn: Version 1.0 October 2015 

 

Page 

24

 of 

24

 

 

INSTALLATION CHECKLIST 

Date 

 

Name 

 

Address 

 

Postcode 

 

Boiler model 

 

Serial number 

 

Is the safety cut-off mounted correctly and functioning?

 

N   

Is the safety cut-off triggered by pressing the red button?

 

N   

Is the load valve correctly installed?

 

N   

Is  the  pump  installed  on  the  correct  side  of  the  load  valve  (i.e.  towards  the 
boiler)?

 

N   

Is the boiler temperature sensor properly mounted?

 

N   

Is the boiler temperature sensor sufficiently secured? 

N   

Is the inside of the boiler dry?

 

N   

Is a draft stabilizer mounted? 

 

N   

Does the chimney function under all draft conditions?

 

N   

 

Measured chimney draught with system at full power. 

pascals 

 

Chimney data plate fitted / position. 

 

10 

Does  the  boiler  room  have  the  correct  size  and  permanently  open  fresh  air 
intake? (building regs part J)

 

N   

 

Air intake size. 

cm

²

 

11 

Has the system been ’quick calibrated’ by weighing the pellets?

 

N   

 

Weight of pellets in 6 minutes. 

12 

Has the client been informed about the importance of weighing the pellets, how 
to weigh the pellets, and how to perform the operation using the controller? 

N   

13 

Are the burner fan and pellet dosing (chimney draught) settings appropriate?

 

N   

 

Fan settings. 
 

14 

O2 readings 
 

14 

Is there an owner’s manual available in the boiler room?

 

N   

15 

Has the client been informed about the location of the burner grate?

 

N   

16 

Has the client been informed about boiler maintenance procedures and how to 
remove and insert the boiler’s cleaning system? 

N   

17 

Has the client been informed on how to change the photo sensor? 

YES NO 

N   

18 

Has the client been informed on how to change the igniter? 

YES NO

 

N   

19 

Has a CO detector been installed to manufacturer’s instructions? 

N   

 

Comments 
Remedial  action 
required 

 

Engineer name 

 

Company 

 

MCS number 

 

HETAS number 

 

Signed 

 

 

Содержание RTB 10

Страница 1: ......

Страница 2: ...sion 7 boiler control system and therefore menus are not described in this manual It is recommended to study the menus before initial start up Keep this manual so you always have it available if you e...

Страница 3: ...ion of your system must cease immediately and must remain so until a solution to the draft problem has been resolved Continuing operation may result in death or injury Always read the manual before in...

Страница 4: ...inistrations for those countries Separate legislation the Clean Air Northern Ireland Order 1981 applies in Northern Ireland Therefore it is a requirement that fuels burnt or obtained for use in smoke...

Страница 5: ...nimum 24W 24W 20W 20W 34W 34W 82W 82W EN303 5 2012 Class 5 5 5 5 5 5 5 5 Controller Version V7 V7 V7 V7 V7 V7 V7 V7 Width mm 506 506 506 506 655 655 723 723 Depth mm 843 843 843 843 843 843 1043 1043...

Страница 6: ...23 mm Height 1300 mm Depth 845 mm Pellet Capacity 320 kg Compatible with RTB sizes 10 16 30 50kW VAC 10 16 Hopper Width 506 mm Width Boiler Hopper 506 mm Height 1827 mm Depth 845 mm Pellet Capacity 50...

Страница 7: ...output 40W Weight 12kg 30kW burner Hourly fuel consumption At 25kW output 5kg Power consumption At nominal output 45W Weight 15kg 40 60kW burner Hourly fuel consumption At 50kW output 10kg Power consu...

Страница 8: ...ler shorten its working life and void any warranty claims The RTB boiler range is not suitable for installation outside The boiler room should be well lit with enough area to refuel the boiler and wor...

Страница 9: ...ved Document J Section 2 and can meet the above requirement The heights and separation distances may have to be increased in particular cases where high wind exposure surrounding tall buildings high t...

Страница 10: ...ing windy conditions Recommended permanent free area vent sizes RTB 10 10kW 85cm RTB 16 17kW 144 5cm RTB 30 25kW 212 5cm RTB 50 46kW 382 5cm HYDRAULIC SYSTEM The RTB range of boiler must be installed...

Страница 11: ...d 2 DHW with 3 port valve Typically used when the DHW cylinder or the coil surface area is large The house is not supplied with heat while producing hot water The house must therefore be able to manag...

Страница 12: ...Ready To Burn Ready To Burn Version 1 0 October 2015 Page 11 of 24 ELECTRICAL SYSTEM Wiring diagram V7 V10...

Страница 13: ...Ready To Burn Ready To Burn Version 1 0 October 2015 Page 12 of 24 Wiring diagram extension module V7 V10...

Страница 14: ...Optional output for equipment EKSTRA 3 PE N L9 Boiler Compressor Valve 1 EKSTRA 3 PE N L10 Boiler Compressor Valve 2 BUS GRD TX RX Expansion module ILT V1 V V2 O2 controller KONTAKT K K1 External ON...

Страница 15: ...t be made to the router these adapters can be used They can establish a connection to your router through your household power cables This solution allows for easy PLUG and PLAY Step 2 You can find yo...

Страница 16: ...ailable for the following devices This will allow you to monitor your boiler from anywhere in the world For Apple devices search StokerApp For Android devices search StokerControl For Windows devices...

Страница 17: ...nal graphs and burner reaction pattern and make adjustments based on the observations Any changes made remotely can be viewed in the event log section of the controller menu After adjusting it should...

Страница 18: ...troller by going to the menu Auger Auger capacity 6 min enter pellet weight Step 2 Adjusting the Fan 1 Turn on the system by pressing the ON OFF button on the controller 2 Go to the Regulation menu se...

Страница 19: ...can be easily performed Boiler All surfaces inside the boiler must be brushed clean of any deposits and the ash can must be emptied Pay special attention to any build up of ash in the rear smoke cham...

Страница 20: ...Mount it correctly Too high chimney draft Install a draft stabilizer in the chimney Set electric ignition power up Reduce the fan speed during ignition Stopped fan Check if the fan can run replace if...

Страница 21: ...d pipes in the installation Insulate with pipe insulation Too many electric ignitions Flow in the system is fluctuating Set the pressure controlled circulation pump to fixed pressure External thermost...

Страница 22: ...ort un insulated smoke pipe 0 3 m Do not cool down the smoke unnecessarily before it reaches the chimney Draft stabilizer Stabilizes the draft and provides the chimney with dry air High boiler tempera...

Страница 23: ...es where RTB UK has no influence In addition the warranty is invalid due to misuse of the burner for example using fuel that is not approved by RTB UK The warranty does not cover parts such as the ele...

Страница 24: ...oduct identification Pellets Systems RTB 10 RTB10 VAC RTB 16 RTB16 VAC RTB 30 RTB 30 VAC RTB 50 RTB 50 VAC is in conformity with the provisions of the following EC directive s including all applicable...

Страница 25: ...esh air intake building regs part J Y N Air intake size cm 11 Has the system been quick calibrated by weighing the pellets Y N Weight of pellets in 6 minutes g 12 Has the client been informed about th...

Отзывы: