background image

 

 

Ready To Burn

 

Ready To Burn: Version 1.0 October 2015 

 

Page 

21

 of 

24

 

 

FLUE GAS CONDENSATION 

When a boiler has an extremely high efficiency the temperature of the flue gas is naturally 
low. Typical flue loss is only 2-3%. This creates greater demands on your chimney and on 
how  to  adapt  the  boiler  to  existing  installations.  It  is  important  to  prevent  condensation 
otherwise  you  risk  developing  soot  into  the  chimney  and  corrosion  on  the  boiler.  

Note:

 if there is water in the boiler it may come from the chimney.  

 

Things that can prevent condensation forming in the boiler and chimney. 

High chimney> 5m. 

Provides a good draft in all conditions.

 

Maintain chimney size throughout its length 

Provides better flow that will carry out more 
moisture.

 

Short un-insulated smoke pipe <0.3 m 

Do  not  cool  down  the  smoke  unnecessarily 
before it reaches the chimney. 

Draft stabilizer 

Stabilizes the draft and provides the chimney 
with dry air.

 

High boiler temperature> 70°C 

A 10 degree rise in boiler temperature gives 
a 10 degree rise in smoke temperature.

 

Suitable smoke temperature> 55°C 

Condensation will form if the boiler is run at 
below 47°C.

 

Heated boiler room 

Lowers cooling of the boiler and smoke pipe 
and  provides  draft  stabilizer  more  hot  air  to 
work with.

 

More oxygen in combustion 

Increases  air  flow  through  the  boiler  and 
carries  more  moisture.  1%  more  oxygen 
costs approx. 0.5% in efficiency.

 

Keep the heat on the boiler continuously 

When  using  DHW  priority  on  controller,  the 
boiler starts from cold each time. The boiler 
does not to dry out between each start. 

Mount exhaust fan to chimney 

Helps  the  flow  of  air  through  the  chimney. 
The exhaust fan be connected directly to the 
controller. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание RTB 10

Страница 1: ......

Страница 2: ...sion 7 boiler control system and therefore menus are not described in this manual It is recommended to study the menus before initial start up Keep this manual so you always have it available if you e...

Страница 3: ...ion of your system must cease immediately and must remain so until a solution to the draft problem has been resolved Continuing operation may result in death or injury Always read the manual before in...

Страница 4: ...inistrations for those countries Separate legislation the Clean Air Northern Ireland Order 1981 applies in Northern Ireland Therefore it is a requirement that fuels burnt or obtained for use in smoke...

Страница 5: ...nimum 24W 24W 20W 20W 34W 34W 82W 82W EN303 5 2012 Class 5 5 5 5 5 5 5 5 Controller Version V7 V7 V7 V7 V7 V7 V7 V7 Width mm 506 506 506 506 655 655 723 723 Depth mm 843 843 843 843 843 843 1043 1043...

Страница 6: ...23 mm Height 1300 mm Depth 845 mm Pellet Capacity 320 kg Compatible with RTB sizes 10 16 30 50kW VAC 10 16 Hopper Width 506 mm Width Boiler Hopper 506 mm Height 1827 mm Depth 845 mm Pellet Capacity 50...

Страница 7: ...output 40W Weight 12kg 30kW burner Hourly fuel consumption At 25kW output 5kg Power consumption At nominal output 45W Weight 15kg 40 60kW burner Hourly fuel consumption At 50kW output 10kg Power consu...

Страница 8: ...ler shorten its working life and void any warranty claims The RTB boiler range is not suitable for installation outside The boiler room should be well lit with enough area to refuel the boiler and wor...

Страница 9: ...ved Document J Section 2 and can meet the above requirement The heights and separation distances may have to be increased in particular cases where high wind exposure surrounding tall buildings high t...

Страница 10: ...ing windy conditions Recommended permanent free area vent sizes RTB 10 10kW 85cm RTB 16 17kW 144 5cm RTB 30 25kW 212 5cm RTB 50 46kW 382 5cm HYDRAULIC SYSTEM The RTB range of boiler must be installed...

Страница 11: ...d 2 DHW with 3 port valve Typically used when the DHW cylinder or the coil surface area is large The house is not supplied with heat while producing hot water The house must therefore be able to manag...

Страница 12: ...Ready To Burn Ready To Burn Version 1 0 October 2015 Page 11 of 24 ELECTRICAL SYSTEM Wiring diagram V7 V10...

Страница 13: ...Ready To Burn Ready To Burn Version 1 0 October 2015 Page 12 of 24 Wiring diagram extension module V7 V10...

Страница 14: ...Optional output for equipment EKSTRA 3 PE N L9 Boiler Compressor Valve 1 EKSTRA 3 PE N L10 Boiler Compressor Valve 2 BUS GRD TX RX Expansion module ILT V1 V V2 O2 controller KONTAKT K K1 External ON...

Страница 15: ...t be made to the router these adapters can be used They can establish a connection to your router through your household power cables This solution allows for easy PLUG and PLAY Step 2 You can find yo...

Страница 16: ...ailable for the following devices This will allow you to monitor your boiler from anywhere in the world For Apple devices search StokerApp For Android devices search StokerControl For Windows devices...

Страница 17: ...nal graphs and burner reaction pattern and make adjustments based on the observations Any changes made remotely can be viewed in the event log section of the controller menu After adjusting it should...

Страница 18: ...troller by going to the menu Auger Auger capacity 6 min enter pellet weight Step 2 Adjusting the Fan 1 Turn on the system by pressing the ON OFF button on the controller 2 Go to the Regulation menu se...

Страница 19: ...can be easily performed Boiler All surfaces inside the boiler must be brushed clean of any deposits and the ash can must be emptied Pay special attention to any build up of ash in the rear smoke cham...

Страница 20: ...Mount it correctly Too high chimney draft Install a draft stabilizer in the chimney Set electric ignition power up Reduce the fan speed during ignition Stopped fan Check if the fan can run replace if...

Страница 21: ...d pipes in the installation Insulate with pipe insulation Too many electric ignitions Flow in the system is fluctuating Set the pressure controlled circulation pump to fixed pressure External thermost...

Страница 22: ...ort un insulated smoke pipe 0 3 m Do not cool down the smoke unnecessarily before it reaches the chimney Draft stabilizer Stabilizes the draft and provides the chimney with dry air High boiler tempera...

Страница 23: ...es where RTB UK has no influence In addition the warranty is invalid due to misuse of the burner for example using fuel that is not approved by RTB UK The warranty does not cover parts such as the ele...

Страница 24: ...oduct identification Pellets Systems RTB 10 RTB10 VAC RTB 16 RTB16 VAC RTB 30 RTB 30 VAC RTB 50 RTB 50 VAC is in conformity with the provisions of the following EC directive s including all applicable...

Страница 25: ...esh air intake building regs part J Y N Air intake size cm 11 Has the system been quick calibrated by weighing the pellets Y N Weight of pellets in 6 minutes g 12 Has the client been informed about th...

Отзывы: