FieldPoint
TM
cFP-20
xx Quick Start Guide
What You Need
to Get Set Up
• cFP-20
xx LabVIEW RT controller
• Mounting hardware (DIN rail, panel-
mount, or rack-mount accessory)
• I/O module(s)
• cFP-BP-
x backplane, connector
blocks, cables
• 11–30 V power supply
• Accessories: Ethernet cable,
number 2 Phillips screwdriver
• PC running Windows
• FieldPoint software 3.0.2 or later
• LabVIEW RT
M
Mo
ou
un
ntt tth
he
e C
Co
om
mp
pa
ac
ctt FFiie
elld
dP
Po
oiin
ntt B
Ba
ac
ckkp
plla
an
ne
e
You can mount the cFP-BP-
x backplane on a 35 mm DIN rail, on a panel, or in a standard 19 in.
rack. Before using any of these mounting methods, record the serial number from the back of
the backplane.
Each set of mounting instructions in this document includes an instruction to connect the
protective earth (PE) ground terminal on the cFP-BP-
x backplane to the system safety ground.
The backplane PE ground terminal has the following symbol stamped beside it:
. Connect the
backplane PE ground terminal to the system safety ground using 14 AWG (1.6 mm) wire with a
ring lug. Use the 5/16 in. panhead screw shipped with the backplane to secure the ring lug to
the backplane PE ground terminal.
1
1
cFP-20xx Quick Start Guide
©
National Instruments Corporation
Содержание FieldPoint cFP-20 Series
Страница 18: ...18 cFP 20xx Quick Start Guide ni com ...