background image

Mounting the Backplane in a Standard 19-in. Rack

A.  Fasten the rack-mount bracket to the back of the cFP-BP-

x using the captive screws on

the bracket.

B.  Bolt the rack-mount accessory to

a standard 19-in. rack.

C.  Connect the PE ground terminal

on the cFP-BP-

x to safety ground.

C

CA

AU

UT

TIIO

ON

N  

Disconnect

power before removing the
backplane from the panel.

 NA

TIO

NA

INS

TR

UM

EN

TS

 NA

TIO

NA

INS

TR

UM

EN

TS

5

cFP-20xx Quick Start Guide

©

National Instruments Corporation

Содержание FieldPoint cFP-20 Series

Страница 1: ...e on a 35 mm DIN rail on a panel or in a standard 19 in rack Before using any of these mounting methods record the serial number from the back of the backplane Each set of mounting instructions in this document includes an instruction to connect the protective earth PE ground terminal on the cFP BP x backplane to the system safety ground The backplane PE ground terminal has the following symbol st...

Страница 2: ...nce Min 165 mm 6 50 in Cooling Outline 51 mm 2 in All Around 4 slots 246 mm 9 68 in 8 slots 441 mm 17 4 in 2 cFP 20xx Quick Start Guide ni com C CA AU UT TI IO ON N Keep in mind these requirements for space and cabling clearance Allow at least 51 mm 2 in all around the backplane for air circulation Allow 38 mm 1 5 in below and 51 mm 2 in above the controller for cabling clearance ...

Страница 3: ...nk screws shipped with the kit B Bolt or screw the panel mount accessory to a panel C Connect the PE ground terminal on the cFP BP x to safety ground NA TIO NA L INS TR UM EN TS 102 mm 4 in 260 mm 10 25 in 102 mm 4 in 457 mm 18 in C CA AU UT TI IO ON N Do not use screws longer than 5 16 in to fasten the panel mount plates to the backplane C CA AU UT TI IO ON N Disconnect power before removing the ...

Страница 4: ...rews shipped with the clip s B Insert one edge of the DIN rail into the deeper opening of the DIN rail clip C Press down firmly on the backplane to compress the spring until the clip locks in place on the DIN rail D Connect the PE ground terminal on the cFP BP x to safety ground C CA AU UT TI IO ON N Do not use screws longer than 5 16 in to fasten the DIN rail clip to the backplane NA TIO NA L INS...

Страница 5: ... the bracket B Bolt the rack mount accessory to a standard 19 in rack C Connect the PE ground terminal on the cFP BP x to safety ground C CA AU UT TI IO ON N Disconnect power before removing the backplane from the panel NA TIO NA L INS TR UM ENT S NA TIO NA L INS TR UM ENT S 5 cFP 20xx Quick Start Guide National Instruments Corporation ...

Страница 6: ...FP 20xx controller is right side up with the NI logo at the top and align the captive screws on the controller with the holes on the backplane C Seat the card edge at the back of the controller in the card edge connector on the backplane D Press the controller firmly to seat it on the backplane E Using a number 2 Phillips screwdriver with a shank of at least 64 mm 2 5 in length tighten the captive...

Страница 7: ...ne e A Align the captive screws on the I O module with the holes on the backplane B Press firmly to seat the I O module on the backplane C Using a number 2 Phillips screwdriver with a shank of at least 64 mm 2 5 in length tighten the captive screws to 1 1 N m 10 lb in of torque D Repeat this procedure to install additional I O modules on the backplane 3 ...

Страница 8: ...or block operating instructions B Align the captive screws on the connector block with the holes on the backplane C Press firmly to seat the connector block on the backplane D Using a number 2 Phillips screwdriver with a shank of at least 64 mm 2 5 in length tighten the captive screws to 1 1 N m 10 lb in of torque E Repeat this procedure to install additional connector blocks on the backplane 4 C ...

Страница 9: ...or the subnet where you want it to be and physically move it to the other subnet 5 C CA AU UT TI IO ON N To prevent data loss and to maintain the integrity of your Ethernet installation do not use a cable longer than 100 m If you are using a 100 Mbps Ethernet National Instruments recommends using a Category 5 shielded twisted pair Ethernet cable W Wi ir re e P Po ow we er r t to o t th he e C Co o...

Страница 10: ...lug in each power supply to the Compact FieldPoint system The cFP 20xx runs a power on self test POST that takes several seconds You should see the POWER and STATUS LEDs come on After about five seconds the STATUS LED begins flashing The cFP 20xx is ready to be configured and you can install the FieldPoint software If you have already assigned an IP address to the cFP 20xx the STATUS LED turns off...

Страница 11: ... NO OT TE E If the setup does not launch automatically select S St ta ar rt t R Ru un n from Windows enter d setup where d is the letter of your CD ROM drive and select O OK K C Co on nf fi ig gu ur re e t th he e c cF FP P 2 20 0x xx x i in n F Fi ie el ld dP Po oi in nt t E Ex xp pl lo or re er r If you do not have version 3 0 2 or later of FieldPoint Explorer download the current version from n...

Страница 12: ...og box appears D Set the Type to E Et th he er rn ne et t as shown in the figure to the right Each Ethernet comm resource represents a single FieldPoint network module on the network E Click B Br ro ow ws se e to launch Remote System Explorer Remote System Explorer searches for any cFP 20xx or other National Instruments Ethernet devices on the subnet F Double click the serial number of the cFP 20x...

Страница 13: ...ddress of a device that acts as a gateway server which is a connection between two networks D DN NS S A Ad dd dr re es ss s The IP address of a network device that stores host names and translates them into IP addresses H Enter values on the System tab of the System Configuration dialog box H Ho os st t N Na am me e Can describe the physical location of the system or the application where it is be...

Страница 14: ... an internal battery backed clock that provides consistent timestamps in the absence of a time server J Click O OK K in the System Configuration dialog box Click Y Ye es s when prompted to reboot the cFP 20xx When the cFP 20xx reboots it should appear in Remote System Explorer with the updated IP address and comment as shown in the following figure If it does not appear select V Vi ie ew w R Re ef...

Страница 15: ...rer and select E Ed di it t t th hi is s c co om mm m r re es so ou ur rc ce e If FieldPoint Explorer finds no devices refer to the user manual B After FieldPoint Explorer finds the Compact FieldPoint modules click the sign next to F FP P R Re es s in the left pane to expand the device hierarchy and display the modules found on the network The hierarchy includes all of the modules connected to the...

Страница 16: ...right click the device name and select E Ed di it t t th hi is s d de ev vi ic ce e The Device Configuration dialog box appears as shown in the figure above For output modules you can choose settings for Watchdog Configuration Refer to the user manual for information about the network watchdog feature ...

Страница 17: ...s 3 Set the deadband for data communication over the network The deadband setting is a percentage of the full scale range 4 Set attributes for selected channel s by selecting the attribute and entering the desired value 5 Send commands to the selected channel s by choosing a command and value and clicking S Se en nd d 6 Repeat this procedure for each channel you want to configure 7 Click O OK K or...

Страница 18: ...18 cFP 20xx Quick Start Guide ni com ...

Страница 19: ...e range and attribute settings you configured to be saved as power up states click O OK K These settings are written to the nonvolatile memory of the controller If you want to save power up values for the range and attribute settings and also all the current output states of the output channels click S Sn na ap ps sh ho ot t This stores the current ranges attributes and output values of the bank t...

Страница 20: ... MB nonvolatile 32 MB DRAM Typical system usage 5 MB nonvolatile 8 4 MB DRAM The operating system and embedded LabVIEW RT use approximately 5 MB of nonvolatile memory and 8 4 MB of DRAM The remainder is available for applications RS 485 Isolation Voltage Maximum isolation voltage 100 Vrms Transient overvoltage 740 Vrms Power Requirement Power supply range 11 to 30 VDC Recommended power supply cFP ...

Страница 21: ...oncondensing Maximum altitude 2 000 m at higher altitudes the isolation voltage ratings must be lowered Pollution Degree 2 Shock and Vibration Operating vibration Random IEC 60068 2 64 10 500 Hz 5 grms Sinusoidal IEC 60068 2 6 10 500 Hz 5 g Operating shock IEC 60068 2 27 50 g 3 ms half sine 18 shocks at 6 orientations 30 g 11 ms half sine 18 shocks at 6 orientations Safety This product is designed...

Страница 22: ...tive EMC 89 336 EEC Cabling The table below shows the standard Ethernet cable wiring connections for both normal and crossover cables Connector 1 Connector 2 pin 1 pin 1 pin 8 pin 8 Ethernet Cable Connector Pinouts 1 white orange white orange white green 2 orange orange green 3 white green white green white orange 4 blue blue blue 5 white blue white blue white blue 6 green green orange 7 white bro...

Страница 23: ...2645 3186 India 91 80 4190000 Israel 03 6393737 Italy 02 413091 Japan 03 5472 2970 Korea 02 3451 3400 Malaysia 603 9596711 Mexico 001 800 010 0793 Netherlands 0348 433466 New Zealand 09 914 0488 Norway 32 27 73 00 Poland 22 3390 150 Portugal 210 311 210 Russia 095 238 7139 Singapore 65 6 226 5886 Slovenia 3 425 4200 South Africa 11 805 8197 Spain 91 640 0085 Sweden 08 587 895 00 Switzerland 056 20...

Отзывы: