The power unit can be placed in one of two locations, front left or rear right
(See Fig. 1)
Unpacking:
Unpacked the lift close to the installation site. Layout a chalk line on
the floor following the floorplan
(See Fig.1).
Stand the columns in place making sure to position the power unit mounting
bracket at the correct location and the lock blocks facing outward.
TOOLS recommended
"Rotary Hammer Drill Or Similar ( If Anchoring ) "Medium Crescent Wrench
"3/4" Masonry Bit ( If Anchoring / Not required) "Medium Pipe Wrench
"Hammer "Crow Bar
"4 Foot Level "Chalk Line
"Open-End Wrench Set: 7/16" - 1-1/8" "Medium Flat Screwdriver
"Socket And Ratchet Set: 7/16" - 1-1/8" "Tape Measure: 25 Foot Minimum
"Hex-Key / Allen Wrench Set "Needle Nose Pliers
COLUMN & CROSSRAIL INSTALLATION
Lay down rear columns. Position the
crossrail at the top of the two columns. (both cross rails are the same ) Install the
crossrail in the column by sliding the plastic guide blocks into the column
channel. The safety latch must be positioned with bevel side to the leg top, and
safety latch facing towards the outside of the lift when you stand the columns
back up. Manually open the safety latch devise on each side of the crossrail and
slide the crossrail down until it rests on the safety lock position closest to the
floor. Repeat the procedure for the remaining columns and crossrail. Stand the
assembled columns up in the positions indicated on the floor plan.