background image

 

 

Track Installation 

Start with the track with the cylinder. This track will be located with the hose 
connection facing out toward the leg with power unit bracket attached. 

NOTE 

The 

power unit can be located in two locations shown. With an assistant, pick up and 
place one end of the main side track on the crossrail, and then pick up and place 
the other end on the opposite crossrail (if you have three assistants, place both 
ends at the same time). Use a large screwdriver or aligning punch to align the 
mounting holes in the cross rails with the mounting holes in the track. 

Do not 

leave the tracks unbolted 

– install the mounting bolts immediately! 

Install 

1/2” x 4” mounting bolts and 1/2” washers 

thru the ramp brackets and wheel 

stops. Make sure the bolt head is on the flat side of the bracket. Install the two 
ramp brackets and two wheel stop with bolts and washers as you secure the 
main side track to the cross rail. Secure the bolts with 1

/2” washers and nuts 

placed 

hand tight

. Now, install the offside track and again secure with ramp 

brackets, wheel stops with 

1/2” x 4” bolts and nuts

.  After both tracks are 

installed, tighten all bolts 1/2” x 4” bolts - torque - 45 ft-lbs. 
 
Find the leg caps 

(4 each), 1/2” x 7” bolts (4 each), 1/2” x 1 1/4” bolts (4 

each), 1/2” nuts (8 each) and 1/2 “ flat washers (16 each), 

holes for cable face 

towards the center of the lift. Secure the leg caps with 

1/2” x 1 1/4” bolts

. Place 

the bolts with washers in through channel and secure with washers and nuts on 
the outside of the leg. Install the 

1/2” x 7

” bolts through the leg and top cap. 

Install from outside of the leg, and secure with a nut on the inside of the leg. 
Tighten the 

1 1/4” bolt

. Tighten the 7” bolt to a torque of 45 ft-lbs. Do not over 

tighten the 

7” bolt

, as this may warp the column channel and bind the guide 

blocks.

 

 

 

 

1)

 The cables are already strung and ready to attach to the top of legs.  Before 

doing this you must extend the chrome rod out of the cylinder far enough for the 
cables to reach. If you have the lift on the lowest lock you will need to extend the 
cable approximately 60 inches. 
 

Содержание NSS-8000

Страница 1: ...NSS 8000 Installation Manual ...

Страница 2: ...5 hours Do not rush It is better to spend a few extra minutes and do the job right If you will avoid the following common mistakes your lift will go together easily and serve you well for many years 1 Do not attempt to use the power unit to extend your cylinder This must be done manually 2 If you do not know how to wire your motor get professional help ...

Страница 3: ...ure to read these instructions may result in injury to user other people within the area of the lift or vehicles We are not responsible for any injury or damage as a result of neglecting to carefully read and follow these instructions Always lock the lift in place before going under the vehicle Never allow anyone to go under the lift when raising or lowering INSPECT your lift daily Never operate i...

Страница 4: ... use to protect the operator from electric shock DANGER The power unit used on this lift contains high voltage Disconnect power at the receptacle before performing any electrical repairs Secure plug so that it cannot be accidentally plugged in during service WARNING RISK OF EXPLOSION This equipment has internal arcing or sparking parts which should not be exposed to flammable vapors This machine s...

Страница 5: ...ocated should be free of overhead obstructions such as heaters building supports electrical lines etc FLOOR REQUIREMENTS Visually inspect the site where the lift is to be installed and check for cracked or defective concrete This lift must be installed on a solid level concrete floor with no more than 2 degrees of slope A level floor is suggested for proper installation and level lifting If a floo...

Страница 6: ...river Socket And Ratchet Set 7 16 1 1 8 Tape Measure 25 Foot Minimum Hex Key Allen Wrench Set Needle Nose Pliers COLUMN CROSSRAIL INSTALLATION Lay down rear columns Position the crossrail at the top of the two columns both cross rails are the same Install the crossrail in the column by sliding the plastic guide blocks into the column channel The safety latch must be positioned with bevel side to t...

Страница 7: ... bolts with 1 2 washers and nuts placed hand tight Now install the offside track and again secure with ramp brackets wheel stops with 1 2 x 4 bolts and nuts After both tracks are installed tighten all bolts 1 2 x 4 bolts torque 45 ft lbs Find the leg caps 4 each 1 2 x 7 bolts 4 each 1 2 x 1 1 4 bolts 4 each 1 2 nuts 8 each and 1 2 flat washers 16 each holes for cable face towards the center of the...

Страница 8: ...o back end of the cylinder opposite the cylinder rod Safety latch linkage rod should pass through guide tubes on underside of track Install the 1 2 x 126 straight safety latch linkage rod into the main side track from the opposite end The rod should pass through two guides on the underside of the main side track Attach the 71 hose to the fitting on the power unit Attach the other end of the 71 hos...

Страница 9: ...heck inside the switch box to make sure you use the correct colored wire for ground Also check the outside plate to make sure your motor is the proper voltage Your motor will be for 110 volts unless you specifically ordered a 220 volt motor Initial Operation Press the UP SWITCH on the power unit Raise the lift slowly until all the slack in the cables is taken out Raise the lift until the safety la...

Страница 10: ...for full engagement in the rack on each leg 3 To lower push UP button to raise rotate latch release rod handle and hold push rod handle on power unit to lower Warning Make sure all four latches release if not STOP raise higher until latch is clear if it does not work now the hemin tie rod end on that latch needs adjustment 4 Any hydraulic oil leakage unusual noise or excessive wear must be fixed b...

Страница 11: ...11 ...

Страница 12: ...12 ...

Страница 13: ...13 ...

Отзывы: