27.
2.5.
Forestay furling jib
If you own a furling jib instead of a hoisting jib install your
forestay as follows:
1.
Make sure the stainless steel jib halyard feeds through the top
block.
2.
Attach the 4mm line to one side of the stainless steel halyard.
3.
Connect the shackle to the other end of the stainless steel
halyard.
4.
Knot the 3mm line to the loose end of the 4mm line. This is
your hoisting mouse line.
5.
You can temporarily tie away the loose end of the 3mm line
to the shackle.
rigging kit furling jib
Tools needed:
- Self-amalgamating tape
Содержание 500 MK2
Страница 1: ...1 ASSEMBLY MANUAL CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR NACRA 500 MK2 ...
Страница 8: ...8 ...
Страница 9: ...Setup Setting up the boat after purchase or long time storage ...
Страница 10: ...1 Basic platform assembly ...
Страница 11: ...11 ...
Страница 20: ...2 Basic mast assembly ...
Страница 21: ...21 21 ...
Страница 29: ...3 Mainsail setup ...
Страница 31: ...31 3 2 Mainsheet 1 8 8mm 1 2 3 4 5 6 7 Main sheet ...
Страница 32: ...4 Jib setup ...
Страница 36: ...5 Rudders ...
Страница 42: ...6 Trapeze setup ...
Страница 47: ...7 Cunningham system ...
Страница 49: ...8 Spinnaker system ...
Страница 64: ...Rigging Rigging the boat to get ready for sailing ...
Страница 65: ...65 ...
Страница 66: ...9 Setting the mast ...
Страница 75: ...10 Mainsail rigging ...
Страница 80: ...11 Jib rigging ...
Страница 88: ...12 Spinnaker rigging ...
Страница 91: ...91 12 3 Spinnaker snuffer system 500MK2 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Страница 94: ...94 12 4 Spinnaker furling system rigging 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Страница 97: ...After Sails Storage Maintainance and Repairs ...
Страница 103: ...103 13 NOTES ...