96
.
5.
Thread one end of the spinnaker sheet through one of
the outboard spinnaker blocks.
6.
Then through both the return blocks fixated on the
front crossbar.
7.
Feed the same end through the other outboard block.
8.
Hoist the spinnaker using the spinnaker halyard. Put
the remainder of the halyard away in the trampoline
bag.
9.
Furl the spinnaker by pulling on one side of the
spinnaker’s drum furling line.
Содержание 500 MK2
Страница 1: ...1 ASSEMBLY MANUAL CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR NACRA 500 MK2 ...
Страница 8: ...8 ...
Страница 9: ...Setup Setting up the boat after purchase or long time storage ...
Страница 10: ...1 Basic platform assembly ...
Страница 11: ...11 ...
Страница 20: ...2 Basic mast assembly ...
Страница 21: ...21 21 ...
Страница 29: ...3 Mainsail setup ...
Страница 31: ...31 3 2 Mainsheet 1 8 8mm 1 2 3 4 5 6 7 Main sheet ...
Страница 32: ...4 Jib setup ...
Страница 36: ...5 Rudders ...
Страница 42: ...6 Trapeze setup ...
Страница 47: ...7 Cunningham system ...
Страница 49: ...8 Spinnaker system ...
Страница 64: ...Rigging Rigging the boat to get ready for sailing ...
Страница 65: ...65 ...
Страница 66: ...9 Setting the mast ...
Страница 75: ...10 Mainsail rigging ...
Страница 80: ...11 Jib rigging ...
Страница 88: ...12 Spinnaker rigging ...
Страница 91: ...91 12 3 Spinnaker snuffer system 500MK2 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Страница 94: ...94 12 4 Spinnaker furling system rigging 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Страница 97: ...After Sails Storage Maintainance and Repairs ...
Страница 103: ...103 13 NOTES ...