44
.
6.2.
Trapeze wires steel
Tools needed:
- Long nose plier
- Self amalgamating tape
1.
Use the shackle 6mm 1/4, 2x nylon washers and the
trapeze ropes or wires.
2.
Put the shackle through the center hole.
3.
Install trapeze wires on each side.
•
Tighten the shackle firmly with the long
nose plier!
4.
Tape the shackle with self amalgamating tape.
2x
6mm 1/4
2x
Содержание 500 MK2
Страница 1: ...1 ASSEMBLY MANUAL CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR NACRA 500 MK2 ...
Страница 8: ...8 ...
Страница 9: ...Setup Setting up the boat after purchase or long time storage ...
Страница 10: ...1 Basic platform assembly ...
Страница 11: ...11 ...
Страница 20: ...2 Basic mast assembly ...
Страница 21: ...21 21 ...
Страница 29: ...3 Mainsail setup ...
Страница 31: ...31 3 2 Mainsheet 1 8 8mm 1 2 3 4 5 6 7 Main sheet ...
Страница 32: ...4 Jib setup ...
Страница 36: ...5 Rudders ...
Страница 42: ...6 Trapeze setup ...
Страница 47: ...7 Cunningham system ...
Страница 49: ...8 Spinnaker system ...
Страница 64: ...Rigging Rigging the boat to get ready for sailing ...
Страница 65: ...65 ...
Страница 66: ...9 Setting the mast ...
Страница 75: ...10 Mainsail rigging ...
Страница 80: ...11 Jib rigging ...
Страница 88: ...12 Spinnaker rigging ...
Страница 91: ...91 12 3 Spinnaker snuffer system 500MK2 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Страница 94: ...94 12 4 Spinnaker furling system rigging 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Страница 97: ...After Sails Storage Maintainance and Repairs ...
Страница 103: ...103 13 NOTES ...