
57.
5.4.
Spinnaker halyard cleat on mast
1.
Install the spinnaker cleat base on the mast. With the long end
pointing down.
2.
Install the 40mm carbo pivoting lead block. The cleat is facing
downwards the sheave is facing down.
3.
If the cleat is not facing down.
• You can unmount the cleat
• Turn it around
• And remount the cleat.
1.
Tie a 15mm ring to one end of the shockcord.
2.
Feed the shockcord from above through the eyelet
located on the side of the trampoline.
3.
Pull the shockcord to the other side and feed it through
the eyelet from below.
4.
Attach a 15 mm ring to the end of the shockcord.
shockcord
5.3.
Spinnaker sheet rings trampoline
2x
15mm
2x
Содержание 500 MK2
Страница 1: ...1 ASSEMBLY MANUAL CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR NACRA 500 MK2 ...
Страница 8: ...8 ...
Страница 9: ...Setup Setting up the boat after purchase or long time storage ...
Страница 10: ...1 Basic platform assembly ...
Страница 11: ...11 ...
Страница 20: ...2 Basic mast assembly ...
Страница 21: ...21 21 ...
Страница 29: ...3 Mainsail setup ...
Страница 31: ...31 3 2 Mainsheet 1 8 8mm 1 2 3 4 5 6 7 Main sheet ...
Страница 32: ...4 Jib setup ...
Страница 36: ...5 Rudders ...
Страница 42: ...6 Trapeze setup ...
Страница 47: ...7 Cunningham system ...
Страница 49: ...8 Spinnaker system ...
Страница 64: ...Rigging Rigging the boat to get ready for sailing ...
Страница 65: ...65 ...
Страница 66: ...9 Setting the mast ...
Страница 75: ...10 Mainsail rigging ...
Страница 80: ...11 Jib rigging ...
Страница 88: ...12 Spinnaker rigging ...
Страница 91: ...91 12 3 Spinnaker snuffer system 500MK2 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Страница 94: ...94 12 4 Spinnaker furling system rigging 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Страница 97: ...After Sails Storage Maintainance and Repairs ...
Страница 103: ...103 13 NOTES ...