81.
11.1.
Hoisting the furling jib 500MK2
1.
Connect the top of the jib to the shackle connected
to the stainles steel halyard.
2.
Detach the 3mm line from the shackle and hoist
the jib little by little. In the meanwhile twist the sail
hanks onto the forestay.
3.
Connect the stay adjuster to the tack of the sail
using a shackle.
4.
Hoist the jib fully.
5.
Thread the 4mm line through the wheel on the
stay adjuster, back through the eye on the hoist
cable and cleat in the cleat on the frontside of the
jib.
6.
Detach the 3mm line and stow it away.
Содержание 500 MK2
Страница 1: ...1 ASSEMBLY MANUAL CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR NACRA 500 MK2 ...
Страница 8: ...8 ...
Страница 9: ...Setup Setting up the boat after purchase or long time storage ...
Страница 10: ...1 Basic platform assembly ...
Страница 11: ...11 ...
Страница 20: ...2 Basic mast assembly ...
Страница 21: ...21 21 ...
Страница 29: ...3 Mainsail setup ...
Страница 31: ...31 3 2 Mainsheet 1 8 8mm 1 2 3 4 5 6 7 Main sheet ...
Страница 32: ...4 Jib setup ...
Страница 36: ...5 Rudders ...
Страница 42: ...6 Trapeze setup ...
Страница 47: ...7 Cunningham system ...
Страница 49: ...8 Spinnaker system ...
Страница 64: ...Rigging Rigging the boat to get ready for sailing ...
Страница 65: ...65 ...
Страница 66: ...9 Setting the mast ...
Страница 75: ...10 Mainsail rigging ...
Страница 80: ...11 Jib rigging ...
Страница 88: ...12 Spinnaker rigging ...
Страница 91: ...91 12 3 Spinnaker snuffer system 500MK2 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Страница 94: ...94 12 4 Spinnaker furling system rigging 3mm 3mm 3mm spin halyard spin tack spin sheet ...
Страница 97: ...After Sails Storage Maintainance and Repairs ...
Страница 103: ...103 13 NOTES ...