![NACD SP214AM Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/nacd/sp214am/sp214am_installation-operation-and-maintenance_702387020.webp)
North American Clutch & Driveline
Rockford, Illinois
Phone: (800) 383-9204
(815) 282-7960
Fax (815) 282-9160
www.naclutch.com
20
6. In a u-joint-type installation, to realize the longest possible life of the power take-off bearings,
the best possible alignment must be maintained between the center line of the power take-off
shaft and the center line of the driven unit shaft. See information contained in Alignment-U-
Joint-Type Installation in this Installation section.
7. In side-load installations, alignment between the driveR and driveN pulleys must be carefully
established and maintained. See Position and Measure Alignment of the Sheave in this
Installation section.
Drive Ring
8. The drive ring must be properly installed. See information in Drive Ring Installation in this
Installation section.
Pilot Bearings
9. Ball-type pilot bearings and Roller-type pilot bearings must be installed properly. See Ball-
Type Pilot Bearing Installation or Roller-Type Pilot Bearing Installation in this Installation section.
Support Plate
10. When mounting the engine and Power Take Off in the machine, a customer-supplied support
plate may be required to support the output end of the pto housing. See the information about
customer-supplied support plates, in the NACD Support Plate Specifications contained in the
Description and Specifications section of this manual.
Failure to follow this requirement may result in damage to the power take off or the engine
flywheel housing.