Steel cables installation
• After pull the synchronous steel cable 1 (that draw from the lifting carriage of main vertical column) pass the bottom of
column steel cable pulley roller B, through the bottom of sub column steel cable pulley roller B, upward through the sub
column top beam pulley roller A , then fix the steel cable by M16 nut in the hole of the fixed plate E ,which on the carriage
of deputy vertical column. Similarly to draw the steel cable 2 from the lifting carriage of deputy vertical column, and fixed it
in the hole of the fixed plate E , which on the main vertical column carriage.
• Check the left carriage and the right carriage, watch if they are at the same height. If not, please loose the nut that located
on the hole of fixed plate E, which on the main vertical column. And then make the carriage of main vertical column drop
down. Or tighten up the nut that located on the hole of fixed plate E, which on the deputy vertical column. And then make
the deputy vertical column lift up. Similarly, when the carriage of main vertical column is lower than the one of deputy
vertical column, reversed adjustment.
The adjustment is required to both reach to the same height, two carriages (left and right) must
be in the same height, the steel cable must be tighten up, not allow any loose, moreover, the steel
cable must be inside the skating slot of steel cable roller, parallel to each other, not allow any
cross, otherwise, two carriages can’t have synchronization effect�
Please as per following picture:
U
U
S
S
E
E
R
R
’
’
S
S
M
M
A
A
N
N
U
U
A
A
L
L
- 14 -
Steel cable installation.
-
After pull the synchronous steel cable 1 (that draw from the lifting carriage of main vertical column) pass the bottom
of column steel cable pulley roller B, through the bottom of sub column steel cable pulley roller B,,upward through
the sub column top beam pulley roller A , then fix the steel cable by M16 nut in the hole of the fixed plate
E ,which on the carriage of deputy vertical column. Similarly to draw the steel cable 2 from the lifting carriage of
deputy vertical column , and fixed it in the hole of the fixed plate E , which on the main vertical column carriage.
-Check the left carriage and the right carriage, watch if they are at the same height. If not, please loose the nut that
located on the hole of fixed plate C, which on the main vertical column. And then make the carriage of main vertical
column drop down. Or tighten up the nut that located on the hole of fixed plate C, which on the deputy vertical
column. And then make the deputy vertical column lift up. Similarly, when the carriage of main vertical column is
lower than the one of deputy vertical column, reversed adjustment
The adjustment is required to both reach to the same height, two carriage (left and right) must be in the
same height, the steel cable must be tighten up, not allow any loose, moreover, the steel cable must be
inside the skating slot of steel cable roller, parallel to each other, not allow any cross, otherwise, two
carriages can’t have synchronization effect. Please as per following photo
:
Install the complete insurance device assembly
- Install the insurance electromagnet assembly on the column.
- Insurance block set on the electromagnet assembly on the inside of column.
A Top beam pulley
B Base plate pulley
C Steel cable 1
D Steel cable 2
E Wire rope boom seat post
F M16 nut
Picture 14
Picture 13
A
Top beam pulley
B
Base plate pulley
C
Steel cable 1
D
Steel cable 2
E
Wire rope boom seat post
F
M16 nut