Screw in the screws lightly, proceeding in a star-like
mode.
Continuing in a star-like mode, tighten the screws to
the prescribed torque pressures.
Torque pressures: 23-25 N·m
Be careful to reassemble the discs in the original posi-
tions (it is advisable to mark them by applying an adhe-
sive label).
This operation is important so that a good
contact between the brake discs and the rel-
ative pads.
Proceed by reassembling the parts in the reverse order
of removal. Consult chapter F “Suspension and
wheels” for further information.
- 16 -
Brakes
H
23÷25 N•m
Front disc assembly
Thoroughly clean the contact surfaces of the discs and
the wheel.
Accurately grease all relative surfaces of the disc
before reassembling.
The following operation is to be carried out on all mod-
els.
Apply thread-locking fluid to the five fixing screws of
the disc.
Recommended thread-locking fluid: Loctite
243
Содержание F4 1000 S
Страница 1: ......
Страница 3: ...Motorcycle workshop manual MV AGUSTA F4 1000...
Страница 6: ......
Страница 7: ...1 General description A SECTION A Revision 0...
Страница 16: ...10 General description A...
Страница 17: ...B 1 Maintenance SECTION B Revision 1...
Страница 49: ...Maintenance 33 B Maintenance FUEL PUMP ASSEMBLY...
Страница 99: ...Maintenance 83 B Turn the holding device counter clockwise Remove the bulb Disconnect the connector...
Страница 107: ...1 Bodywork C SECTION C Revision 0...
Страница 114: ...8 Bodywork C TAIL UNIT...
Страница 117: ...C Bodywork 11 Remove the side fairing toward the outside taking care of the rear pin anchored in the support brackets...
Страница 118: ...12 Bodywork C FUEL TANK...
Страница 126: ...AIR INTAKE SYSTEM 20 Bodywork C...
Страница 131: ...HEAT SHIELD Bodywork 25 C...
Страница 134: ...28 Bodywork C MUDGUARD CENTRAL SPOILER RADIATOR PROTECTION Right side Left side...
Страница 137: ...Air intake injection system 1 D SECTION D Revision 1...
Страница 156: ...20 Air intake injection system D...
Страница 157: ...Electrical system 1 E SECTION E Revision 1...
Страница 161: ...5 Electrical system E 5A 5C 5B ELECTRICAL DIAGRAM F4 1000...
Страница 204: ...48 Electrical system E...
Страница 205: ...1 F Suspension and wheels SECTION F Revision 0...
Страница 262: ...Suspension and wheels F 58 Utilising a press fit the bearings and the roller bearing units see figure...
Страница 285: ...Frame 1 G SECTION G Revision 1...
Страница 318: ...34 Frame G...
Страница 321: ...Frame 37 G Before proceeding with frame reassembly replace the previously removed electrical wiring and components...
Страница 324: ...40 Frame G...
Страница 347: ...H 1 Brakes SECTION H Revision 0...
Страница 372: ...26 Brakes H...
Страница 373: ...Cooling system SECTION L Revision 0 L 1...
Страница 401: ...Special tools 1 M SECTION M Revision 1...
Страница 404: ...Special tools M 4...
Страница 406: ...Special tools M 6...
Страница 408: ...Special tools M 8...
Страница 410: ...Special tools M 10...
Страница 412: ...Special tools M 12...
Страница 413: ...1 Tightening torques N SECTION N Revision 1...
Страница 414: ...2 Tightening torques N...
Страница 415: ...Tightening torques 3 N...
Страница 416: ...4 Tightening torques N...
Страница 417: ...Diagnostic 1 O SECTION O Revision 0...
Страница 423: ...Analytical index 1 P SECTION P Revision 1...
Страница 427: ......
Страница 428: ......