Suspension and wheels
F
- 21 -
Screw in and tighten the three screws (
1
) at the base
of the steering.
Carry out this assembly correctly. A casual or
inexact assembly could compromise the sta-
bility and steering of the motorcycle.
Fit the right-hand leg following a similar procedure.
1
Tighten the three screws (
1
) at the base of the steer-
ing.
Effectuate the operation several times until the
torque wrench does not turn the screw any more
.
This operation must be carried for both stems.
Grease only the first threads.
Torque pressure: 8 ÷ 9 N·m
8÷9 N•m
1
Ensure that the steering head is sitting perfectly in its
seat. Tighten the two screws (
2
) of the steering
head/stems to the prescribed torque pressure and suc-
cessively tighten the central screw (
3
).
Torque pressure steering head (2):
16 ÷ 18 N·m
Torque pressure central screw (3):
22 ÷ 24 N·m
Grease only the first threads.
This check is necessary for the correct
positioning of the stems even if the steering
head has not been removed. This check
guarantees the standard set-up of the
motorcycle.
22÷24 N•m
16÷18 N•m
2
3
Содержание F4 1000 S
Страница 1: ......
Страница 3: ...Motorcycle workshop manual MV AGUSTA F4 1000...
Страница 6: ......
Страница 7: ...1 General description A SECTION A Revision 0...
Страница 16: ...10 General description A...
Страница 17: ...B 1 Maintenance SECTION B Revision 1...
Страница 49: ...Maintenance 33 B Maintenance FUEL PUMP ASSEMBLY...
Страница 99: ...Maintenance 83 B Turn the holding device counter clockwise Remove the bulb Disconnect the connector...
Страница 107: ...1 Bodywork C SECTION C Revision 0...
Страница 114: ...8 Bodywork C TAIL UNIT...
Страница 117: ...C Bodywork 11 Remove the side fairing toward the outside taking care of the rear pin anchored in the support brackets...
Страница 118: ...12 Bodywork C FUEL TANK...
Страница 126: ...AIR INTAKE SYSTEM 20 Bodywork C...
Страница 131: ...HEAT SHIELD Bodywork 25 C...
Страница 134: ...28 Bodywork C MUDGUARD CENTRAL SPOILER RADIATOR PROTECTION Right side Left side...
Страница 137: ...Air intake injection system 1 D SECTION D Revision 1...
Страница 156: ...20 Air intake injection system D...
Страница 157: ...Electrical system 1 E SECTION E Revision 1...
Страница 161: ...5 Electrical system E 5A 5C 5B ELECTRICAL DIAGRAM F4 1000...
Страница 204: ...48 Electrical system E...
Страница 205: ...1 F Suspension and wheels SECTION F Revision 0...
Страница 262: ...Suspension and wheels F 58 Utilising a press fit the bearings and the roller bearing units see figure...
Страница 285: ...Frame 1 G SECTION G Revision 1...
Страница 318: ...34 Frame G...
Страница 321: ...Frame 37 G Before proceeding with frame reassembly replace the previously removed electrical wiring and components...
Страница 324: ...40 Frame G...
Страница 347: ...H 1 Brakes SECTION H Revision 0...
Страница 372: ...26 Brakes H...
Страница 373: ...Cooling system SECTION L Revision 0 L 1...
Страница 401: ...Special tools 1 M SECTION M Revision 1...
Страница 404: ...Special tools M 4...
Страница 406: ...Special tools M 6...
Страница 408: ...Special tools M 8...
Страница 410: ...Special tools M 10...
Страница 412: ...Special tools M 12...
Страница 413: ...1 Tightening torques N SECTION N Revision 1...
Страница 414: ...2 Tightening torques N...
Страница 415: ...Tightening torques 3 N...
Страница 416: ...4 Tightening torques N...
Страница 417: ...Diagnostic 1 O SECTION O Revision 0...
Страница 423: ...Analytical index 1 P SECTION P Revision 1...
Страница 427: ......
Страница 428: ......