If interventions have been carried out on
the throttle bodies, the transmission of the
throttle control must be analysed not only at
the throttle control handgrip but also near
to the throttle bodies.
It is therefore necessary to consult chapter
D “Air intake injection system”.
- 50 -
Maintenance
B
Maintenance
After making adjustments, check that the throttle
valves open slightly by activating the choke lever (
1
) as
indicated in the following figure.
As a final control and after having reassembled all the
components, switch on the engine and check that, with
the choke lever activated, the tickover of the engine
does not exceed
2500 r.p.m.
1
Содержание F4 1000 S
Страница 1: ......
Страница 3: ...Motorcycle workshop manual MV AGUSTA F4 1000...
Страница 6: ......
Страница 7: ...1 General description A SECTION A Revision 0...
Страница 16: ...10 General description A...
Страница 17: ...B 1 Maintenance SECTION B Revision 1...
Страница 49: ...Maintenance 33 B Maintenance FUEL PUMP ASSEMBLY...
Страница 99: ...Maintenance 83 B Turn the holding device counter clockwise Remove the bulb Disconnect the connector...
Страница 107: ...1 Bodywork C SECTION C Revision 0...
Страница 114: ...8 Bodywork C TAIL UNIT...
Страница 117: ...C Bodywork 11 Remove the side fairing toward the outside taking care of the rear pin anchored in the support brackets...
Страница 118: ...12 Bodywork C FUEL TANK...
Страница 126: ...AIR INTAKE SYSTEM 20 Bodywork C...
Страница 131: ...HEAT SHIELD Bodywork 25 C...
Страница 134: ...28 Bodywork C MUDGUARD CENTRAL SPOILER RADIATOR PROTECTION Right side Left side...
Страница 137: ...Air intake injection system 1 D SECTION D Revision 1...
Страница 156: ...20 Air intake injection system D...
Страница 157: ...Electrical system 1 E SECTION E Revision 1...
Страница 161: ...5 Electrical system E 5A 5C 5B ELECTRICAL DIAGRAM F4 1000...
Страница 204: ...48 Electrical system E...
Страница 205: ...1 F Suspension and wheels SECTION F Revision 0...
Страница 262: ...Suspension and wheels F 58 Utilising a press fit the bearings and the roller bearing units see figure...
Страница 285: ...Frame 1 G SECTION G Revision 1...
Страница 318: ...34 Frame G...
Страница 321: ...Frame 37 G Before proceeding with frame reassembly replace the previously removed electrical wiring and components...
Страница 324: ...40 Frame G...
Страница 347: ...H 1 Brakes SECTION H Revision 0...
Страница 372: ...26 Brakes H...
Страница 373: ...Cooling system SECTION L Revision 0 L 1...
Страница 401: ...Special tools 1 M SECTION M Revision 1...
Страница 404: ...Special tools M 4...
Страница 406: ...Special tools M 6...
Страница 408: ...Special tools M 8...
Страница 410: ...Special tools M 10...
Страница 412: ...Special tools M 12...
Страница 413: ...1 Tightening torques N SECTION N Revision 1...
Страница 414: ...2 Tightening torques N...
Страница 415: ...Tightening torques 3 N...
Страница 416: ...4 Tightening torques N...
Страница 417: ...Diagnostic 1 O SECTION O Revision 0...
Страница 423: ...Analytical index 1 P SECTION P Revision 1...
Страница 427: ......
Страница 428: ......