Dehumidifier ML420-MLT1400
Figure 4.2 Changing panel positions
Figure 4.3 Rotor stop (E) and filter monitors (F)
1. Remove the two bolts (B) securing the front panel and carefully remove the panel.
2. Remove the two bolts securing the rear panel and carefully remove the panel.
3. Remove the two bolts (A) and washers securing the control and top panels, then carefully remove the
top panel.
4. Remove the cable duct covers (C), re-route the cables and fit the control panel (D) onto the opposite side
of the unit. Refit the cable duct covers.
5. Loosen the rotor stop (E) and the two filter monitors (F). Remove the cable ties.
6. Fit the rotor stop and filter monitors on the opposite side of the unit. Tie the cables.
7. Fit the front, rear and top panels in their new positions.
4.5 Duct installation
4.5.1 General recommendations
The connections for process and reactivation air are designed in accordance with the recommendations in
ISO 13351. The rectangular duct connections contain tapped inserts for M8 screws.
Figure 4.4 Duct connections
190TGB-1035-H1604
Installation
9