Dehumidifier ML420-MLT1400
4.3 Foundation
The dehumidifier must be installed on a level floor, or on a platform capable of supporting the machine
weight. If the maximum floor loading weight is not exceeded, special foundations are not required.
When the dehumidifier has been installed, check that it is level.
If local regulations require that the unit is permanently fixed in position, the fixing holes can be used for
bolting the unit to the floor.
Figure 4.1 Drilling pattern
4.4 Mirror handed duct connections
The front and rear panels are interchangeable, so that the connections for process air and dry air may be
situated either on the left or right side of the unit.
The dehumidifiers are delivered with the process and dry air connections on the left side of the unit. If
it is required to change the orientation, so that the connections are on the right side of the unit, proceed
as follows.
W
W
WARNING!
ARNING!
ARNING!
Make sure that the dehumidifier is disconnected from the mains power before changing the positions of the
process air and dry air connections.
8
Installation
190TGB-1035-H1604