IceDry 800/1400
3
Transport, inspection and storage
3.1 Moving the equipment
The dehumidifier is delivered on a pallet and must be handled carefully. All panel doors on the unit must be
closed during transport. Provided that the dehumidifier is still secured to its delivery pallet, it can be moved
using a fork-lift truck.
Weight of the dehumidifier can be found in section
.
3.2 Packaging and delivery inspection
1. Check the delivery against the delivery note, order confirmation or other delivery documentation and
check that everything is included and nothing is damaged.
2. Contact Munters immediately if the delivery is not complete in order to avoid installation delays.
3. If the unit is to be put into storage prior to installation, see section
Storing the equipment.
NOTE!
If installation is not to be carried out immediately after arrival of the equipment, it is advisable to leave
the packaging material in place on the dehumidifier, or to re-use the packaging material to provide temporary
protection for the unit during later transportation to the site and during installation.
4. Remove all packaging material from the unit, check carefully to make sure that no damage has occurred
during transportation.
5. Any visible damage must be reported in writing to Munters within 5 days and prior to installation of
the unit.
6. Dispose of the packaging material according to local regulations.
NOTE!
G3 filter cartridges for process and reactivation air are included in the delivery. One cartridge is mounted
on the dehumidifier process air inlet and one on the outside of the cold-storage room, in the reactivation air inlet.
3.3 Storing the equipment
The following is important if the dehumidifier is to be stored prior to installation:
■
Place the dehumidifier in an upright position on a horizontal surface.
■
Protect the dehumidifier from physical damage.
■
Store the dehumidifier under cover and protect it from dust, frost, rain and aggressive contaminants.
190TGB-1037-G1307
Transport, inspection and storage
5