"Sensors" menu - configuration and calibration
Carrying out basic initialisation
8
30252060-02-EN
V2.20161017
27
6.
Wait a short time until the water has settled.
7.
Press:
⇨
The following screens appear one after the other:
8.
Press:
⇨
You have successfully completed the 100 litre calibration.
Carrying out basic initialisation
During basic initialisation the TANK-Control II control unit uses a signal to activate the sensor once in
order to ensure that all the connections are OK.
1.
Open the "Sensors" menu.
2.
Press:
>
⇨
The following screen will appear:
3.
Press
to start basic initialisation.
8.3
Procedure
www.ROLTRONIK.pl
Содержание TANK-Control II
Страница 65: ...w w w R O L T R O N I K p l...
Страница 66: ...w w w R O L T R O N I K p l...