MTZ 1220.1/1220.3
Section G. Operating instruction
G5
External tie-links
Partial locking
The horizontal movement of the imple-
ment in the working position shall be pro-
vided by connecting the tie-links to the
lower holes of the brackets (1) and adjust-
ing the length by means of the tie-links (2)
to ensure the implement swinging to each
side by at least 125 mm or in accordance
with the operating manual for the imple-
ment.
When working with ploughs, adjust the
length of the right-hand tie-link to the
treatment depth.
ATTENTION! The implement swinging
amplitude shall be obligatorily ensured
to be at least 125 mm to avoid breakage
of the tie-links when lifting the imple-
ment to the transportation position.
When transferring the implement to the
transportation position, tension the tie-
links (2). The swinging of the implement
within 20 mm to both sides is allowed.
Full locking
To provide the full locking of the imple-
ment in the working position, connect the
tie-links (2) to the upper hole of the
bracket (1) and reduce their length as
much as possible having ensured the im-
plement swinging within 20 mm to both
sides.
Содержание 1220.1
Страница 1: ...MTZ 1220 1 1220 3 1220 1 0000010 OM OPERATOR S MANUAL 2010...
Страница 161: ...MTZ 1220 1 1220 3 Section I Coupling of implements I15...
Страница 232: ......
Страница 236: ......
Страница 241: ......
Страница 243: ......