7 Maintenance
Maschinenfabrik Reinhausen GmbH 2020
49
5993419/02 EN
VACUTAP
®
VMS
®
A label on the inside of the door of the TAPMOTION® ED motor-drive unit
also specifies the relevant maintenance interval.
Figure 22: Label showing maintenance intervals
Maintenance intervals with MR monitoring system
WARNING
Danger of explosion!
If pending maintenance work is not carried out immediately, this may lead to
death or serious injury as a result of a progressive short circuit, for example.
► Contact the Maschinenfabrik Reinhausen GmbH Technical Service de-
partment as soon as the MR monitoring system issues a maintenance
warning.
► In the event of failure or shutdown of the MR monitoring system, observe
the maintenance intervals as specified in the maintenance plan without
the MR monitoring system.
If you are operating the on-load tap-changer with an MR monitoring system,
the maintenance intervals displayed by the MR monitoring system shall ap-
ply. More information can be found in the operating instructions for the MR
monitoring system.
Содержание VACUTAP VMS
Страница 1: ...On load tap changer VACUTAP VMS Operating Instructions 5993419 02 EN Selector size C ...
Страница 69: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 69 5993419 02 EN VACUTAP VMS 9 2 Selector ...
Страница 71: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 71 5993419 02 EN VACUTAP VMS 9 3 On load tap changer head ...
Страница 74: ......
Страница 75: ......
Страница 76: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 76 5993419 02 EN VACUTAP VMS 9 4 Tools 9 5 Additional drawings ...
Страница 79: ......