4 Commissioning
Maschinenfabrik Reinhausen GmbH 2020
33
5993419/02 EN
VACUTAP
®
VMS
®
4.1.2 Bleeding on-load tap-changer head and suction pipe
4.1.2.1 Bleeding on-load tap-changer head
1. Open all forward valves and return valves in the pipe system.
2. Remove screw cap on air-vent valve E1 on the on-load tap-changer head
cover.
Figure 19: Screw cap
3. Use screwdriver to lift valve tappet on air-vent valve E1 and bleed on-load
tap-changer head.
Figure 20: Valve tappet
4. Seal air-vent valve E1 with screw cap (tightening torque 10 Nm).
Содержание VACUTAP VMS
Страница 1: ...On load tap changer VACUTAP VMS Operating Instructions 5993419 02 EN Selector size C ...
Страница 69: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 69 5993419 02 EN VACUTAP VMS 9 2 Selector ...
Страница 71: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 71 5993419 02 EN VACUTAP VMS 9 3 On load tap changer head ...
Страница 74: ......
Страница 75: ......
Страница 76: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 76 5993419 02 EN VACUTAP VMS 9 4 Tools 9 5 Additional drawings ...
Страница 79: ......