7 Maintenance
Maschinenfabrik Reinhausen GmbH 2020
48
5993419/02 EN
VACUTAP
®
VMS
®
7.2 Maintenance intervals
Maintenance intervals without MR monitoring system
WARNING
Danger of explosion!
If pending maintenance work is not carried out immediately, this may lead to
death or serious injury as a result of a progressive short circuit, for example.
► Adherence to the following maintenance intervals is mandatory.
If you are operating the on-load tap-changer without an MR monitoring sys-
tem, the following maintenance intervals shall apply.
Interval
Action
after 300,000 switching operations (mo-
tor-drive unit counter reading)
Maintenance of the on-load tap-changer.
Contact the Maschinenfabrik Rein-
hausen GmbH Technical Service [
after 600,000 switching operations (mo-
tor-drive unit counter reading)
Replacement of diverter switch insert.
Contact the Maschinenfabrik Rein-
hausen GmbH Technical Service [
after 1.2 million switching operations
(motor-drive unit counter reading)
Selector maintenance. Contact the
Maschinenfabrik Reinhausen GmbH
Technical Service [
for this.
Table 6: Maintenance plan without MR monitoring system
Содержание VACUTAP VMS
Страница 1: ...On load tap changer VACUTAP VMS Operating Instructions 5993419 02 EN Selector size C ...
Страница 69: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 69 5993419 02 EN VACUTAP VMS 9 2 Selector ...
Страница 71: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 71 5993419 02 EN VACUTAP VMS 9 3 On load tap changer head ...
Страница 74: ......
Страница 75: ......
Страница 76: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 76 5993419 02 EN VACUTAP VMS 9 4 Tools 9 5 Additional drawings ...
Страница 79: ......