Installation and start up
membra
Pure
GmbH
Wolfgang-Küntscher-Str.14
16761 Hennigsdorf
Germany
Tel.: +49 (0) 3302/201-20 0
Fax.: +49 (0) 03302/201-20 21
E-Mail: [email protected]
Internet: www.membrapure.de
page 23
The system prompts to install the pretreatment module
ProPak-R10 and the conditioning module now*
-
Please install the pretreatment module ProPak-R10
and the conditioning module (see chapter 4.5, 4.7).
-
Confirm the entry
*if the system has no UF-Modul (RE / AL / AL.TI), polisher modul (UPW-Pak)
should be installed now
For the period of
1 hour
* the pretreatment module ProPak-
R10, the reverse osmosis module and the conditioning
module are going to be flushed
*Aquinity² E : 1 hour
*Aquinity² P : 15 mins
If the conductivity of the permeate is less than 20 µS/cm
and the conductivity of the (EDI)-deionized permeate is less
than
0,1* µS/cm
, the tank is going to be filled until 50%
*Aquinity² E : 0,1 µS/cm
*Aquinity² P : 2 µS/cm
Following the ultra pure water part will be flushed for:
-
45 minutes (with UF-Modul)
OR
-
5 minutes (without UF-Modul)
The system prompts to install the polisher module UPW-Pak
now*
-
Please install the polisher module UPW-Pak (see
chapter 4.5, 4.7).
-
Confirm the entry
*this step is only available for the system with UF-Modul
For the period of 5 minutes the polisher module UPW-Pak is
going to be flushed.
Содержание Aquinity 2 E
Страница 64: ...Service setup Page 59 9 3 Control board ...