GSM-204-423
Pre-power up checks
31st Oct 01
Inst. 7–4
Installation & Configuration: Horizon
macro outdoor
CONTROLLED INTRODUCTION
68P02902W03-A
Visual
inspection
Inspect the installation for damage in accordance with BS 7671, 16th Edition
(Section 712), or the IEC 364 or local equivalent.
WARNING
If damage is discovered during the visual inspection, the
commissioning must not proceed further until the damage
has been inspected and rectified by the manufacturers or
their representatives.
Power equipment
Examine the power equipment for mechanical damage and report any damage
to Motorola.
Ensure all cabinet earth plates are connected to the site earth.
Cabinet structure
Examine the exterior and interior of the cabinets for structural, paint or
mechanical damage and report any damage to Motorola.
Weather protection
Check all environmental seals to ensure they are not damaged.
Check that all cables entering the cabinet have grommets fitted at the point of
entry to prevent the ingress of water. If any holes in the earth plates are not
used, these must have rubber bungs fitted to prevent water entering the cabinet.
Request for
connection
Ensure that all correct Request for connection and Completion and
inspection form certificates have been sent to the local electricity supply board.
NOTE
Samples of a typical Request for connection and a
Completion and inspection form are shown in Sample
form 1 and Sample form 2 at the end of this chapter.
Apply conductive non-oxidizing grease to the earth mat connection on the earth
busbar if an earth mat connection is used.
Содержание Horizonmacro outdoor
Страница 126: ...GSM 204 423 31st Oct 01 ii Installation Configuration Horizonmacro outdoor CONTROLLED INTRODUCTION 68P02902W03 A ...
Страница 128: ...GSM 204 423 31st Oct 01 iv Installation Configuration Horizonmacro outdoor CONTROLLED INTRODUCTION 68P02902W03 A ...
Страница 140: ...GSM 204 423 31st Oct 01 ii Installation Configuration Horizonmacro outdoor CONTROLLED INTRODUCTION 68P02902W03 A ...
Страница 142: ...GSM 204 423 31st Oct 01 iv Installation Configuration Horizonmacro outdoor CONTROLLED INTRODUCTION 68P02902W03 A ...
Страница 160: ...GSM 204 423 31st Oct 01 ii Installation Configuration Horizonmacro outdoor CONTROLLED INTRODUCTION 68P02902W03 A ...
Страница 162: ...GSM 204 423 31st Oct 01 iv Installation Configuration Horizonmacro outdoor CONTROLLED INTRODUCTION 68P02902W03 A ...
Страница 178: ...GSM 204 423 31st Oct 01 ii Installation Configuration Horizonmacro outdoor CONTROLLED INTRODUCTION 68P02902W03 A ...
Страница 180: ...GSM 204 423 31st Oct 01 iv Installation Configuration Horizonmacro outdoor CONTROLLED INTRODUCTION 68P02902W03 A ...
Страница 206: ...GSM 204 423 31st Oct 01 ii Installation Configuration Horizonmacro outdoor CONTROLLED INTRODUCTION 68P02902W03 A ...
Страница 208: ...GSM 204 423 31st Oct 01 iv Installation Configuration Horizonmacro outdoor CONTROLLED INTRODUCTION 68P02902W03 A ...