6A
6B
EN
EN
LO
01
• NO input for complete maneuver button
02
• Common
LS
01
• NO input for pedestrian maneuver button
02
• Common
LE
01
• NC input for external photocells
02
• Common
LA
01
• NC input for internal photocells
02
• Common
LC1
01
• NC input for anti-crushing photocells
02
• Common
LC
2
01
• NC input for anti-crushing photocells
02
• Common
ANT
01
• Antenna
02
• GND
To improve the knowledge about the operation of the control board, before setting up,
pay particular attention to the following instructions.
LED
s
LS
• LED On when pedestrian opening is active.
LO
• LED On when full opening is active.
LE
• LED on when the photocell is active or the LE circuit is closed.
LA
• LED on when the photocell is active or the LA circuit is closed.
LC1
• LED on when the circuit LC1 is closed (anti-crushing photocells).
LC2
• LED on when the circuit LC2 is closed (anti-crushing photocells).
01
• Connect all accessories according to the connections diagram
(page 22A).
02
• Connect the control board to a 20V power supply
03
• Check if the gate movement is the same as shown on the display:
04
• Make a course programming - menu
P0
(
page 9A
).
05
• If necessary, adjust the deceleration time of the gate at opening and closing - menu
P1
(
page 10A
).
06
• Adjust the gateforce and sensivity - menu
P2
(
page 10B
).
07
• Re-program the course - menu
P0
(
page 9A
).
08
• Enable or disable the use of Photocells in menu
P5 and P6
(
page 12B and 13A
).
09
• Program a remote control (
page 7A
).
The control board is now fully configured!
Check the pages of the menu programming if you want to configure other features of the
Control board.
CLOSE
OPEN
If the display does not match the
movement of the gate, switch off the control
board from power supply and change the wires
of Motor1 (0 and 0) and Motor2 (0 and 0).
The installation process assumes that the gate already has mechanical or
electrical limit switches installed. For more information read the motor's
manual
CHARACTERISTICS
RECOMMENDATIONS PRIOR TO PROGRAMMING
BASE INSTALLATION PROCESS
02. CONTROL BOARD
02. CONTROL BOARD
03. INSTALLATION
After completing the entire installation of the electrical panel, it is mandatory
to seal with silicone all openings in the box (accesses, cable passages and slots)
to prevent the entry of moisture and insects that could compromise the normal
functioning of the electrical components.