User’s Manual Supplement
Physical Instructions for Installing an
Encapsulated Hockey-Puck (HPP) Instrument
and LH2 Field-Mount Enclosure Apparatus
Specifications and information subject to change without notice.
© 2006 Moore Industries-International, Inc.
United States • [email protected]
Tel: (818) 894-7111 • FAX: (818) 891-2816
Australia • [email protected]
Tel: (02) 8536-7200 • FAX: (02) 9525-7296
Belgium • [email protected]
Tel: 03/448.10.18 • FAX: 03/440.17.97
The Netherlands • [email protected]
Tel: (0)344-617971 • FAX: (0)344-615920
China • [email protected]
Tel: 86-21-62491499 • FAX: 86-21-62490635
United Kingdom • [email protected]
Tel: 01293 514488 • FAX: 01293 536852
Figure 1. Installation dimensions for LH2 enclosure.
Suitability for the Installation—To determine if a unit’s
area classification approvals are appropriate for a
particular installation, first inspect the classification
labeling on the instrument and/or instrument enclosure
and the “Control Drawing for Installation” found in the
User’s Manual (where applicable). Second, consult the
installation criteria for the approval or electrical standard
agencies governing your location to determine if the
unit’s approvals are suitable for the installation. If the
instrument’s labeling matches the agency criteria and/or
electrical codes for the area, the unit is suitable for the
installation. To determine if the unit’s electrical and
environmental specifications are appropriate for the
installation, consult the “Specifications” table in the
User’s Manual for that instrument. If the instrument’s
electrical and environmental characteristics are within
the expected ambient operating conditions for the
installation, the instrument is suitable for the installation.
CAUTION
If for any reason you are uncertain as to whether the
instrument’s specifications or area classifications meet
the operational or safety requirements for the installation,
consult Moore Industries prior to installation.
Installation of LH Enclosure Apparatus
1. Install the LH2 enclosure onto a surface, temperature
thermowell, or onto a standard 2-inch pipe using the
mounting hardware. Remove the cap from the LH2 by
rotating the cap counter clockwise after unlocking by
rotating the locking screw clockwise.
2. Connect input and output wiring in accordance with the
connection information found in the User’s Manual for
that instrument.
3. Replace the cap to the LH2 by rotating the cap
clockwise. Secure (lock) the cap by rotating the
locking screw counterclockwise.
4. Connect a ground wire between the ground screw on
the LH2 enclosure to an appropriate earth ground.
Ground Wire Recommendations
The following ground wiring practices must be followed
to ensure proper performance of the Moore Industries
instrument in any application.
• Any Moore Industries product in a metal case or
housing must be grounded.
• All input signals to, and output signals from, Moore
Industries’ products should be connected using a
shielded, twisted pair technique. Shields should be
connected to an earth or safety ground at the unit itself.
• The maximum allowable length of any unshielded
portion of the input and/or output connections is 2
inches (50.8mm).
See the User’s Manual for the instrument for additional
installation information.
92mm
(3.61 in)
9mm
(0.35 in)
87mm
(3.44 in)
Conduit
Entry Port
89mm
(3.5 in)
84mm
(3.30 in)
CL
61mm
(2.4 in)
2-in Pipe Bracket
Mounting Holes (4)
61mm
(2.4 in)
Process Connection
1/2-in NPT (N and M models) or
G½ (BSP) (C models)
61mm
(2.4 in)
10-32
Mounting
Holes (2)
51mm
(2.0 in)
Safety Lock
(LH2 only)
Metal Tag
BOTTOM
INSIDE
2-INCH PIPE MOUNTING HARDWARE
30mm
(1.2 in)
DIA. 72mm
(DIA. 2.85 in)
Instrument
Mounting Holes
40mm (1.56 in)
Instrument
Mounting
Holes
33mm
(3.07 in)
I.D. 62mm x 19mm Deep
(2.43 in x 0.76 in Deep)
Ground
M4.0 x 0.7
(4 places)
FRONT
SIDE
Содержание TDZ
Страница 4: ......
Страница 28: ...24 The Interface Solution Experts THZ TDZ...